Covid-19 ‘new normal’ could boost site productivity

Aaron Morby 4 years ago
Share

Embedding many working practices born out of the urgent challenges of the pandemic offer an opportunity for long term rises in construction productivity and safety.

Quality, cost and safety improvements would come at a cost of longer programmes
Quality, cost and safety improvements would come at a cost of longer programmes

That is the message from an academic snapshot study of six major construction schemes that successfully adopted to safer distance working.

Researchers at Loughborough University found that while overall site productivity was negatively impacted by social distancing requirements, individual and team effectiveness and productivity actually improved.

They saw better and more detailed task planning, reduced waiting time between tasks, increased space and therefore less “overlap” of trades.

There was also a boost in the use of technological solutions, more responsibility for individuals and less meetings.

Balfour Beatty, GKR Scaffolding, Kier, Mace, Morgan Sindall, and Skanska opened their sites to researchers.

One manager highlighted they had seen a 50% workforce reduction but only 30% reduction in output.

Another said: “With the productivity and the new ways of thinking we believe we only need 7 ½ people to do the same as 10 people”

Factors behind productivity uplift

  • Better and more detailed task planning
  • More space, fewer people, and less overlap of trades in the workplace improves gang/task productivity
  • Better planning by workers e.g. preparation of workplaces re: tools and materials
  • Less double handling of materials
  • Fewer people ‘hanging around’ waiting to start work/tasks
  • More streamlined worker flow due to workers staggering their start times, reducing the need to queue for site access or changing rooms
  • People chatting less (due to distancing, one-way walkways etc), less talking on phones
  • On one site there was a perception that those who had returned to site were the more motivated workers, the ‘team-players’
  • Some workers may also have been enthusiastic and energised at returning to work after furlough

The research also explored the effects of working from home and found that, notwithstanding the cost, flexibility and productivity benefits, making this a permanent solution could have a negative impact on staff with a rise in social isolation and uncertainty of expectations.

Clients would need to accept longer programme times to enjoy benefits of new normal

The report paid tribute to the phenomenal effort by site staff, frontline workers and occupational health and safety professionals to adapt safely and efficiently to the rapidly evolving situation.

But it also warned: “There have been very high demands on many site and support staff to implement changes to adapt to Covid-19, with adverse impacts on wellbeing for some.

“It is important that they have time and opportunity to recover and regroup, particularly as a ‘second wave’ of Covid-19 could make further demands.”

The report concludes: “Covid-19 has highlighted construction’s flexibility, resilience, and ability to solve problems.

“It has enabled several projects to move forward with innovations which might otherwise have taken several years to embed.

“It has also inspired many to raise their game and has challenged some conventional thinking about the ways in which projects are planned and undertaken.”

But it warns there is a high potential for things to drift back towards ‘business as usual’ as Covid-19 related constraints are relaxed and as commercial pressures once again come to the fore.

It strongly recommends that individual companies and projects conduct a ‘lessons learned’ review before long to capture the changes made and ensure that positive changes are captured and embedded.

Loughborough University: “COVID-19 and construction: Early lessons for a new normal?”.

Latest news

Ridge buys rival consultant Jubb

Acquisition will see 100 new staff join Ridge
4 hours ago

Enabling works to start £130m Huyton town centre regen

Phase one includes a new council HQ, hotel and 72 flats
5 hours ago

Grainger build to rent pipeline rises to £1.4bn

Rental specialist buys sites in Sheffield and Cardiff to build 600 rental homes
5 hours ago

Kier wins Cambridgeshire County council estate upkeep

Firm will provide building and M&E services to 106 buildings across the county
4 hours ago

Louvres and solar shading specialist files for administration

Hampshire based ALPS lodges court notice after 25 years in business
5 hours ago

Speedy Hire posts a loss in latest results

Hire giant confident of better performance in next six months
5 hours ago

Esh to lead next phase of Riverside Sunderland regeneration

Infrastructure work will allow further development of Sheepfolds area
4 hours ago

Green light for £1.3bn Edinburgh coastal town revamp

First phase of Granton Waterfront scheme will see Cruden Homes create a new community
22 hours ago

Vistry chief operating officer steps down

Earl Sibley exits as his COO role axed for more direct reporting to CEO
1 day ago

House builder Camstead goes into administration

Work stopped on three current sites
2 days ago

Death of piling legend Roger Bullivant

Industry innovator dies after long illness aged 85
1 day ago

ESS Modular went down owing suppliers £7m

Modular specialist owned by ISG owner Cathexis
1 day ago

Builders back farmers in inheritance tax protest

"A rethink is desperately needed" say National Federation of Builders
1 day ago

Willmott Dixon wins £36m leisure centre upgrade

Work to start on historic Westminster 1930s Grade II listed Seymour Centre
1 day ago

Graham wins £100m Cardiff Crossrail phase 1

Work on route to Cardiff Bay to start before end of next year
2 days ago

Laing O’Rourke appoints new European MD

Peter Lyons to take-up new role in February
3 days ago

Profits dip at Stepnell ahead of demerger

Turnover and secured workloads up ahead of restructure
3 days ago

HS2 green bridge deck takes shape

100m-wide wildlife bridge to carry hedgerows and country lane over HS2
2 days ago

1,000-home Wolverhampton city centre scheme in for planning

ECF and council advance City Centre West build to rent scheme
3 days ago

Sisk clinches £54m North London council HQ revamp

Haringey's iconic Grade II listed civic centre to be brought back into use
3 days ago

Ofgem approves £2.5bn Eastern Green Link 1

Work to start next Spring on cable project from Scotland to the north of England
3 days ago

Anglian Water hunts for £1bn delivery partner

Programme delivery partner wil integrate with client team over 15-year plan
3 days ago

Hadden collapse costs supply chain £6.7m

"Highly unlikely" subcontractors will receive anything for their unpaid invoices
3 days ago

Management buyout at M&E specialist

£25m turnover Kimpton in second MBO in its 60-year history
3 days ago

BAM finalises £71m deal to replace first major RAAC school

Work to start on new St Leonards Catholic School in Durham
3 days ago

Scaffolder hit by two tonne weight at nuclear plant

Court hands out £633,000 in fines after Dungeness B decommissioning incident
3 days ago

Go-ahead for 860,000 sq ft East London medical campus

Whitechapel Road scheme of six new and repurposed buildings
3 days ago

Site labour rates hit record high as cost inflation returns

Industry's biggest payroll firm says rates rose nearly 5% last month in London
6 days ago

Morris & Spottiswood acquires part of ISG fit-out division

ISG Cathedral acquisition saves 111 jobs and expands presence across England
7 days ago

New work drives Q3 construction output uplift

Third quarter activity up 0.8% despite slowdown in September
6 days ago

Contractor services