Laing O’Rourke lands £195m zero carbon office job

Grant Prior 4 years ago
Share

Developer Landsec and Laing O’Rourke have signed a pre-construction services agreement (PCSA) for main building work on the sustainable Timber Square development in London.

A start date is yet to be confirmed for the scheme to build 370,000 sq ft of mixed-use space, including 350,000 sq ft of grade A offices, affordable workspace, roof terraces and enhanced public realm.

Landsec’s Head of Development, David Heaford, said: “We have completed a rigorous assessment process to reach this stage.

“We are delighted to be working with a globally-recognised contractor to deliver this exciting, sustainable development which focuses on connecting communities within a net zero carbon scheme.”

The development will retain 90% of the existing building and use a hybrid steel frame and timber structure, significantly reducing embodied carbon, construction traffic, demolition waste and local air pollution.

Low carbon and recycled materials will also be used across the scheme which is 10 years ahead of UKGBC net zero carbon targets for energy intensity reduction targets.

Céire O’Rourke, Director of UK Clients & Markets at Laing O’Rourke said: “We are excited at being appointed preferred bidder to deliver Timber Square, which is a bold and pioneering project with sustainability at its core.

“Our unique operating model, based on digital engineering, precision manufacturing at our factory in the east Midlands and assembly on site, will help us bring to life LandSec’s vision of modern buildings which support sustainable living and working in the heart of London.

“Our team will now bring the power of their experience to the table to work closely with the client team and make this stunning project a reality.”

Latest news

Planning officers to get powers to bypass committee stage for housing

Rayner reform plan to cut out local council planning committees
16 hours ago

National Insurance hike to delay construction recovery

Arcadis paints varied picture with full recovery delayed until 2026
21 hours ago

Gratte Bros rides out cost rises with profit increase

M&E specialist warns of further upward pressure on wage costs
21 hours ago

Sellar’s 36-storey London City office tower approved

Demolition work to start in 2026 at 60 Gracechurch Street site
3 days ago

Roofers caught using phone lights to work at night

Roofing boss handed suspended prison sentence for lack of edge protection
22 hours ago

£380m North West housing framework out for bid

St Helens-based Torus aims to build 9,000 homes by 2029
22 hours ago

Historic property magazine to close

Estates Gazette has been in business since 1858
4 days ago

M&S Marble Arch rebuild approved after three-year planning fight

Plans were delayed when Michael Gove backed carbon campaigners
5 days ago

£191m revamp funding approved for London Barbican Centre

Construction to start in 2027 on five-year programme
4 days ago

RED Construction tops £100m turnover

Builder maintains profit margin at 1.7% as business nearly doubles in size
4 days ago

Timber designs shortlisted for roads ‘footbridge of the future’

Three of five designs for National Highways propose timber structures over busy highways
4 days ago

PM pledges to fast-track 150 infrastructure schemes

Fresh promise to speed up planning decisions on infrastructure and house building
5 days ago

Amey FM firm fined after legionella kills prisoner

Court fines company £600,000 for prison upkeep failures
4 days ago

Buyers report boom in commercial work

Construction bucks slowdown in general economy
5 days ago

Plans in for £250m Stockport 8 housing-led scheme

Work to start on phase 1 by the end of next year
5 days ago

Galliford Try tops monthly contracts league

Contract awards slow down in November
5 days ago

Erith explosives set demolition record at Sizewell

Watch blast at former nuclear turbine hall: Video
5 days ago

Vistry to build 950 homes next to Olympic Park

Developer signed for £600m Pudding Mill Lane scheme in East London
5 days ago

Inflatable formwork used for 45m tall cement silo

Ground-breaking dome silo inflated at Tilbury Docks
5 days ago

Briggs & Forrester sells maintenance arm

100 engineers to move over to new owner
6 days ago

£2bn Edinburgh ‘West Town’ scheme approved

7,000 homes to be built at 205-acre site
6 days ago

Rayner approves Lancashire super prison

Communities secretary overrules planning inspector for 1,700 inmate prison.
6 days ago

Wates boss returns after collapse of his own contractor

Paul Nicholls was head of the failed Real construction group
7 days ago

Trio secure Birmingham deal to retrofit 3,000 homes a year

Specialist contractors to install insulation, efficient heating and solar panels
6 days ago

Costain confirms £400m HS2 tunnels win

Work to start early next year on tunnel and lineside mechanical and electrical systems
6 days ago

First nuclear reactor installed at Hinkley: Video

Watch precision operation at Somerset site
6 days ago

Winner named for Harbourside revamp

Local Irvine contractor to start transformation of beach front
6 days ago

New Fair Payment Code goes live today

Latest bid to get subcontractors and suppliers paid within 30 days
7 days ago

Lincolnshire concrete supplier files administration notice

Ever Readymix Concrete & Screed operates three depots and a fleet of 20 trucks
7 days ago

Graham lands first deal on Liverpool’s largest brownfield site

Contractor bags infrastructure package on 10.5 hectare site
1 week ago

Contractor services