Mechanical, Electrical and Plumbing (MEP) |
•MEP Temporary Services |
•Prefabrication of Skids, Horizontal Modules |
•Prefabrication Vertical Risers and Services |
•Electrical services |
•Ground Source Heating & Cooling System |
•Mechanical Services |
•Water System Commissioning |
•HVAC system and implementation |
•BMS, SCADA, EMS system and implementation |
•IT and Telecommunication services |
•PAVA equipment supply |
•Commissioning Management |
Align / BBV / EKFB |
Drainage |
•Drainage works and installation |
•Drainage system design |
•Invert drainage pipes and fittings |
•Pumped Drainage stations |
Align / BBV / BBVS / EKFB / Mace Dragados / SCS |
Environmental |
•Aquatic Ecology activities |
•Arboricultural (Tree, pruning & Removal) |
•De-vegetation |
•Ecology |
•Habitat creation |
•Landscaping (Hard/Soft/Planting/Urban Realm) |
•Environmental Surveying Services |
•Environmental Waste Disposal |
Align / BBV / EKFB / SCS |
Fencing |
• Acoustic barriers |
• Fencing – temporary site requirements |
• Fencing – permanent |
• Highway Safety Barriers – permanent |
Align / BBV / BBVS / EKFB / Mace Dragados |
General Civils/Earthworks |
•Civils Labour Frameworks |
•Compounds |
•Concrete Cutting & Breaking |
•Demolition |
•Earthworks |
•Fit Out Works |
•General site civils works |
•Ground Remediation |
•Trial pitting/intrusive survey |
BBV / BBVS / EKFB / Mace Dragados |
Ground Engineering |
•Ground Investigation |
•Dewatering (Pump Test) |
•Ground Source Heat Pumps |
•Microboring |
•Tag & Trace |
•Temporary Ground Support |
Align / BBV / EKFB / SCS |
Materials |
• Aggregates (Imported Fill) |
• Bearings (supply) |
• Brickwork & Blockwork – Internal |
• Bridge Bearings |
• Cladding – Brick/Metal/Timber |
• Earthworks Equipment (Purchase) |
• Fixings / fasteners |
• Lattice girder |
• Timber supply |
• Metal Doors & Ironmongery |
• Handrails & Balustrades |
• Staircases – permanent |
• Painting – Specialist Coatings |
• Precast Beams |
• Precast Concrete |
• Ready Mixed Concrete |
• Reinforcement (Steel, Bar/Cages) |
• Segmental Viaduct Casting Cells |
• Structural Steel |
Align / BBV / EKFB / SCS |
Plant and Tool Hire |
•Lighting towers |
•Mobile and tower Cranes |
•Power tools |
•Plant Hire Frameworks |
•Pumping equipment (Platforms for pumps / substations) |
•Safety Boats |
•Tunneling Plant |
Align / BBV / BBVS / EKFB / Mace Dragados / SCS |
Preliminaries & Temporary Works |
•Asbestos Removal |
•Asbestos Surveys |
•Design of Temporary Works |
•Instrumentation and Monitoring |
•Temporary Lifts |
•Materials testing and sampling |
•Modular Site Buildings |
•On-site Laboratory Buildings |
•PPE |
•Preliminary Test Piles |
•Scaffolding and Access |
•Temporary Bridges |
•Temporary Hoarding |
•Multi Service Vehicles (MSV’s) |
Align / BBV / BBVS / EKFB / Mace Dragados / SCS |
Site Services |
•Bromford Existing Pier Assessment |
•Compound Security |
•CCTV Equipment |
•Facilities Management |
•Fleet Vehicles |
•Fuel |
•HSEQ response service |
•IT equipment – supply & management |
•Laundering services |
•Logistics |
•Occupational Heath |
•Road Rail Access Points (RRAP) |
•Site Access Solution |
•Site Catering |
•Site Signage |
•Traffic Management |
•Vehicle Management System (VMS) |
•Waste Management Services (WMS) |
Align / BBV / BBVS / EKFB / Mace Dragados / SCS |
Structures |
•Box Slides (alternative off-line installation method) |
•Cofferdam |
•Culverts |
•Expansion Joints |
•Footpaths / street design and build |
•Formwork, Reinforcement and Concrete |
•FRC Base Slab |
•Metalwork |
•Overbridge construction |
•Piling and Dwalls for retained structures |
•Post Tensioning |
•Roofing |
•Sheet Piling |
•Structural Strengthening |
•Structures Equipment |
•Walkway systems |
•Viaducts |
•Waterproofing |
BBV / BBVS / Mace Dragados / SCS |
Support for Detailed Design |
•Specialist Detail Design Consultants |
•Consultancies with Network Rail/London Underground experience |
•MEP Detailed Design |
Align / BBV / Mace Dragados / SCS |
Tunneling |
•Cutter Disk for Tunnel Boring Machine |
•Fire Protection equipment |
•Oils & Greases – Tunnel Boring Machine |
•Pipes & Fittings – Tunnel Boring Machine (Slurry, air, water) |
•Tunnel Boring Machine excavation |
•Tunnel Gas Detection System |
•Tunneling Labour Framework |
•Tunnel Segments and Moulds |
•Tunnel Sprayed Concrete Lining |
•Specific Tunneling equipment (Refuge chambers, Hyperbaric chambers) |
•Tunnel utilities brackets (wall hangers) |
•Tunnel Walkways |
•Tunnel Walkway/Brackets – temporary |
•Tunnel waterproofing |
Align / BBV / BBVS / EKFB / Mace Dragados / SCS |
Utilities & Supplies |
•Buried Services Co-ordination |
•Fuel supply, storage & management |
•Temporary Buildings for utilities |
•Sewer Surveys (Including physical coring works) |
•Temporary services – power |
•Temporary services – water |
•Utility Connections |
•Utilities Design & Construction |