Five in race for £465m HS2 lift and escalator deals

Aaron Morby 4 years ago
Share

HS2 has invited five firms to bid to design, deliver and maintain almost 300 low-energy lifts and escalators for the first phase’s four major new stations.

Lifts and escalators design for Old Oak Common
Lifts and escalators design for Old Oak Common

The firms will tender for two separate packages covering lifts and escalators worth £267m and £198m, respectively.

  • Fujitec UK
  • Kone
  • Otis
  • Schindler
  • Thyssenkrupp Elevator UK

Contracts are expected to be awarded next year and the value includes maintenance for 20 years.

Around 160 lifts and 130 escalators will be installed across the project, placed end to end, the escalators would stretch more than 3km.

The longest escalators will be at Old Oak Common, in west London, which will take passengers 13.5m up from the subsurface platforms to concourse level.

In total, the new station – where HS2 meets Crossrail services to Heathrow and the West End of London – will need more than 50 lifts and escalators.

Three of HS2’s new stations will be built to the highest industry standard – ‘BREEAM Excellent’ – in terms of sustainable lifetime performance, with Birmingham Interchange set to achieve the higher level of ‘BREEAM Outstanding’.

HS2’s procurement and commercial director, David Poole, said: “This invitation to tender is a key step forward in the delivery of HS2’s four iconic new railway stations.

“The lifts and escalators our partners go on to deliver will be at the heart of the operation, moving hundreds of thousands of people every day and helping us to ensure seamless journeys for everyone.”

 

Latest news

Morgan Sindall lands £20m Brunswick Wharf scheme in Bideford

North Devon waterside project will provide 100 flats
4 hours ago

New BAM leisure centre pool springs a leak

Contractor investigating "technical issues" delaying new £36m green leisure centre
7 hours ago

Green light for £150m West End office revamp

Shaftesbury Avenue office retrofit retains 75% of original building
13 hours ago

Former Keltbray managers jailed after corruption trial

Jail sentences following bribery probe on jobs including Battersea Power Station
1 day ago

Lidl pumps £500m into store and logistics expansion

Discounter plans 40 new stores this year as expansion ramps up
13 hours ago

JJ Rhatigan UK profit jumps as turnover tops £150m

Irish contractor's expansion in England gathers pace
14 hours ago

Driverless digger to be used on Taylor Woodrow site

Autonomous excavator to work at Manchester Airport after successful trial
14 hours ago

MCS Build lands Basingstoke warehouse scheme

Construction starts this month after £26m funding deal
13 hours ago

Leeds United unveil stadium revamp design

Club has still to set a timeframe for staged Elland Road upgrade
22 hours ago

Bowmer & Kirkland boosts margins as profits surge to £69m

Revenue nudges up towards £1.3bn in year of expansion
2 days ago

Offshore construction starts on £4bn windfarm

Foundations for first of 95 turbines installed: Watch video
2 days ago

AECOM buys civils consultant Allen Gordon

Global giant acquires Scottish water and energy specialist
2 days ago

Plans in for £1bn Northern Gateway site in Manchester

Plan for 500-acre manufacturing and logistic park advance
2 days ago

RED wins £31m London Shoreditch student digs job

Two extra floors will be added to Willen House scheme
2 days ago

Deconstruct handed £12m Grenfell demolition

Firm maintaining building awarded job without bid race to speed process
2 days ago

Sizewell site workers get made to measure PPE

Bespoke fitting service on offer at new Bryson branch
2 days ago

Comment: Gateway is acting like a barricade

Contractors left banging their heads on an (unbuilt) brick wall
5 days ago

Final phase of £1.5bn Elephant and Castle revamp hits planning

Get Living submits revised plan for 500 homes and 450-bed student block
5 days ago

Ealing backs final phase of £1.3bn estate rebuild

Friary Park estate rebuild in Acton reaches end stage
5 days ago

Green light for scaled-down Nottingham student tower

Glasshouse Street scheme will deliver 247 student rooms
5 days ago

Aston Villa to revamp North Stand

Club to reuse existing structure rather than complete rebuild
5 days ago

Mace signs ex-ISG director to lead Euro health and tech push

Gary Sweeney to head up healthcare and life sciences consultancy arm
5 days ago

Sir Robert McAlpine claws way back into profit

Firm says return to profit and strong cash balance validates new strategy
6 days ago

Severfield to cut staff by 6% amid pricing pressure

Steelwork contractor warns of extended tighter pricing due to project delays
6 days ago

JRL completes sale of 50% stake to Malaysian giant IJM

Deal boosts balance sheet and kicks starts growth plan
6 days ago

Green light for £100m Liverpool Baltic station build

Enabling highway works to start in the autumn
6 days ago

First live tests for flying construction robots

Drones can lay construction materials at height on site
6 days ago

Three firms land £170m Gentoo Sunderland housing deal

PHS Solutions, Esh and RE:GEN to deliver 10-year home upgrade plan
6 days ago

Gateway gridlock hits build-to-rent delivery as starts nosedive

Build to rent starts plunge 18% in the capital
7 days ago

Call to shift Gateway 2 checks to end building bottleneck

"The current system isn't working but we all want to see safe buildings"
7 days ago

Contractor services