Winvic starts £93m Edgbaston Stadium build to rent job

Aaron Morby 4 years ago
Share

Winvic Construction is starting work on two projects around Edgbaston Stadium in Birmingham.

The Residence build to rent scheme design by CallisonRTKL
The Residence build to rent scheme design by CallisonRTKL

The bulk of works will be to build a £93m private rental flats scheme for developer Patrizia UK.

The firm’s civil arm also has secured highways works for Warwickshire County Cricket Club as it creates 76,000 sq ft of car parking and a large piazza ahead of the Commonwealth Games in 18 months.

On ‘The Residences’ build to rent scheme, Winvic will deliver 375 flats across five concrete-framed blocks of five, seven, eight, 13 and 18-storeys building using two site tower cranes

Full fit-out will also be undertaken by Winvic and the project handover will take place over five phases, facilitating the cricket club, car park, conference facilities and practice nets to remain open throughout the works.

Job includes a landscaped podium deck with undercroft car parking and also a rooftop amenity space for residents to enjoy

Edgbaston Road will be realigned and a new opening on Pershore Road will be formed by Winvic as part of the programme, plus an access road through the site will also be constructed.

The work is scheduled to be completed in the second half of 2023.

Initial activity for WCCC on the western side of the stadium will include ground works as well as the demolition of a derelict building.

This is in preparation for the reconfiguration of the existing car park and creation of new parking areas, resulting in a further 229 spaces than the current provision.

A new 56,500 sq ft entrance plaza will also be constructed, which will enhance the main arrival space for visitors as well as help improve accessibility and circulation around the famous cricket stadium.

Mark Jones, Winvic’s Director of Multi-room, said: “The Residences BTR project and redevelopment works for Warwickshire County Cricket Club are both exciting schemes in different ways, and winning these contracts illustrates Winvic’s breadth of experience across the various areas of construction.

“We have already built a great relationship with these two new clients and we’re looking forward to exceeding their expectations.”

Craig Flindall, Chief Operating Officer at Warwickshire CCC, said: “Today’s start by our construction partner Winvic ensures that key elements of our redevelopment project will be completed ahead of the Birmingham 2022 Commonwealth Games and everything will be completed by Autumn 2023.

“In the coming weeks we intend to reveal plans for the third phase of the Edgbaston Masterplan, which will include the next phase of the redevelopment of the stadium”.

Latest project news

Galliford Try to upgrade Red Arrows base

Contractor seals quartet of RAF base upgrades
12 months ago

Galliford Try bags £87m Brent Cross build to rent job

Firm picks up another three blocks at Argent's North London £8bn regeneration scheme
1 year ago

Balfour starts £67m Edinburgh school campus

Passivhaus certified campus buildings will replace Liberton High School
1 year ago

Red wins Bristol retirement village £14m expansion

44 extra care flats to be built at former Frys chocolate factory
1 year ago

Caddick bags UK’s largest fertiliser plant job

Yorkshire contractor seals £28m contract for new plant in Yorkshire
1 year ago

Mace wins concrete bunkers for world’s most powerful laser

Firm will build two 7m tall bunkers with 2m thick radiation resistant concrete walls
1 year ago

Robertson to deliver £20m Alloa Wellbeing Hub and school

Design work will now start on Wellbeing Hub and Lochies primary school
1 year ago

Green light for Canada Water next phase of 380 homes

Zone G plan includes major resi tower, supermarket and park
1 year ago

Mace to start £230m Landsec London office job

Timber Square project will pioneer a hybrid cross laminate timber and steel superstructure
1 year ago

British Land multi-storey logistics hub approved

London urban last-mile logistics hub pipeline hits £1.3bn
1 year ago

£350m Birmingham triple tower scheme approved

Vast curving Ringway Centre to be demolished for 1,750 flats development
1 year ago

Midgard lands £245m Tottenham Hale towers

Three towers of up to 38 storeys complete north London regeneration scheme
1 year ago

Go-ahead for Wates £35m Hartlepool leisure centre job

Work on the Highlight waterfront centre to start in November
1 year ago

Green light for 690-home Birmingham Smithfield scheme

Prosperity Group plans to start work in Autumn next year on major Smithfield scheme
1 year ago

Go-ahead for 289 homes next to Saltaire World Heritage site

Ambitious plan to demolish a vacant Bradford office complex for new residential quarter
1 year ago

Plans in for 800-bed Leeds student and retail scheme

Major scheme will replace The Core shopping centre in the city
1 year ago

McAleer & Rushe awarded £60m Barking flats job

Work to start in November on near 200 rental homes project
1 year ago

ISG clinches £155m Cat D prison expansion

Firm to deliver 780 new places at three existing prison locations
1 year ago

27-storey Salford student tower approved

540-bed student block to be built on former site of McDonalds' regional HQ
1 year ago

Morgan Sindall £48m Dumfries school job approved

Building work to start before the end of 2023
1 year ago

Bouygues/Murphy JV tipped for £2.3bn Thames tunnel job

Frontrunner emerges for Lower Thames Crossing 4.2km tunnel job
1 year ago

Vinci/McAlpine JV to start £105m NHS rehabilitation centre

Treasury clears New Hospital Programme job to start main construction
1 year ago

Three giant lab buildings approved at £700m Oxford R&D district

Phase 2 Oxford North office and lab buildings to deliver 460,000 sq ft of space
1 year ago

RG Group to build tallest student block in the world

Contractor confirmed on 45-storey tower in Leeds
1 year ago

Vinci wins major St Helens town centre revamp

£90m first phase includes new market hall, 120-bed hotel and over 60 flats
1 year ago

Work to start this year on Manchester £250m spa resort

Developer Therme gets green light for re-engineered 28-acre Trafford complex
1 year ago

Barhale JV sign-off for £18m Dewsbury sewage works upgrade

Project forms part of Yorkshire Water’s £500m investment in Phosphorous removal
1 year ago

Murphy seals main build on £124m Essex station

Contractor lands main contract after successful start on enabling works package
1 year ago

GMI lands latest £42m phase of lab cluster

Citylabs life sciences complex in Manchester continues to grow
1 year ago

Green light for Canada Water commercial scheme

Twin-tower scheme will offer "a new type of office for London"
1 year ago

Contractor services