Green light for 24-storey London city office tower

Aaron Morby 3 years ago
Share

Property developer Brockton Everlast has got the planning thumbs up for its ‘greened’ 24-storey office building in London’s Square Mile.

The proposed 117m tall building will be built at 115-123 Houndsditch next to the Can of Ham building.
The proposed 117m tall building will be built at 115-123 Houndsditch next to the Can of Ham building.

It is the seventh major office scheme to gain planning in the City so far this year, underlying growing momentum for a new wave of major building projects post-pandemic.

Brockton Everlast said the 720,000 sq ft project, which has been designed by architect AHMM to deliver exemplary green credentials, will involve a total investment of over £320m.

Chair of the City Corporation’s Planning and Transportation Committee, Alastair Moss, said: “115-123 Houndsditch is the seventh office-led tall building scheme to secure planning permission in the Square Mile this calendar year.

“This is not only an unprecedented number of major developments to come for decision, but it also clearly illustrates the enduring strength of the office market in the City of London and unwavering confidence from developers.”

Consented Square Mile office schemes in 2021


  • Brockton Everlast:  24-storey office, 115-123 Houndsditch
  • Great Portland Estates: 13-storey 320,000 sq ft office, 2 Aldermanbury Square
  • CO-RE: 660,000 sq ft, 21-storey office scheme, 120 Fleet Street.
  • British Land: Broadgate 37-storey East Tower and 22-storey West Tower.
  • Tenacity: 33-storey scheme at 70 Gracechurch Street
  • Tenacity: 30-storey development 55 Gracechurch Street
  • BREO Hundred: 13-storey 140,000 sq ft office block Fetter lane

Demolition of the existing Houndsditch building and archaeological investigation will take around a year, with construction then expected to take three and a half years, employing around 660 workers on average during the build.

The development design aims to reduce operational carbon emissions by 44%, compared to a Building Regulations compliant building.

It will incorporate thermal stores to retain heat for use during colder months with a heat exchange scheme to share the excess waste heat, which cannot be stored, with the neighbouring Middlesex Street Estate.

The development also includes urban greening features including green walls and landscaped terraces and balconies for office occupiers.

The building will feature green balconies and large roof terraces with trees

Consultant Atelier 10 is investigating the potential for recycling the existing building’s steelwork frame and processing clean concrete back to aggregate for concrete construction.

Delivery of a LEED ‘Platinum’ and WELL ‘Platinum’ rated scheme which represents the highest level of attainment with respect to holistic environmental design and delivers a project with health and wellbeing at its core.

Client project team

Building to be supported at ground level by an array of 5-floor tall Y-shaped transfer props

Development Manager: Brockton Everlast Inc.
PM & EA: Gardiner & Theobald
Architect/Lead Designer: AHMM
Structural & Civils: AKT II
Building Services: NDY
Environmental Design: Atelier 10
Cost Consultant: Alinea

Development Director at Brockton Everlast, Richard Berry, said: “This scheme has been designed from the start with a relentless focus on carbon reduction. We tasked the architects to create an exceptional and sustainable design – one that delivers a vastly improved operational carbon footprint as part of our goal to future-proof the building for the next generation of net-zero occupiers.”

Latest news

Kier wins first phase of £700m Warwick Uni campus build

Firm to start work on science and engineering precinct last this year
8 hours ago

Torsion and Khalbros to build new Leeds £1bn neighbourhood

Eastgate Quarter site acquired from Hammerson
9 hours ago

JCB to double size of US factory in wake of Trump tariffs

$500m Texas factory under construction to expand to 1m sq ft
9 hours ago

Green light for £2.4bn Luton Airport expansion

Government go-ahead to transform airport
10 hours ago

Diversification pays off for concrete frame specialist Statom

Strong results as £180m turnover firm expands into infrastructure sector
11 hours ago

Cardo in talks to buy Breyer roofing arm

More than 100 jobs could be saved at Breyer Roofing
17 hours ago

Quartet win £750m Wales & Western railway deal

Network Rail confirms partners for Reactive and Minor Works framework
16 hours ago

Plans in for £350m London Bridge life sciences hub

Snowsfields Quarter will consist of three buildings containing labs
17 hours ago

Surging labour costs push tender price forecast up

Pick-up in tender prices despite weak growth
17 hours ago

Permasteelisa wins cladding deal on Multiplex city tower

Facade specialist wins work on Fenchurch Street ‘hanging gardens’ tower
17 hours ago

Wates wins fit-out for Manchester First Street Hub

Smartspace arm secures another Government hub deal
2 days ago

Peel Ports reveals winners for £750m framework

18 firms win places on deal: Full list
2 days ago

Big trade names dropped in M Group rebrand

Acquisitive group formed from Morrison Utility services in 2016
1 day ago

Breyer Group files administration notice

Staff hope rival firm could buy assets and save jobs
2 days ago

Former Severfield director takes helm at Embrace Steel

New CEO Martin Kelly aims to step up expansion of steelwork contractor
2 days ago

£302m upgrade funding awarded to FE colleges – list

Cash shared out between England’s 179 college groups
2 days ago

FK Facades thrives but construction arm hit by ISG row

Dispute with failed contractor costs specialist £5.5m
2 days ago

Galliford Try gets go-ahead for Milton Keynes PRS tower

33-storey tower needs gateway 2 approval before work can start
2 days ago

Small house builders get £150m funding for green homes

Developers will have to meet-up to ten new criteria to benefit from interest rate discounts
2 days ago

Lendlease Construction renamed Bovis

US private equity firm completes £35m purchase of UK contracting business and rebrands
3 days ago

Breyer Group battles for survival as rivals circle

Housing maintenance firm fights three winding up petitions in a month
3 days ago

Careys facing £2.4m claim by developer over demolition cartel

Giant Hong Kong developer claims it was overcharged on Lots Road Power Station job
3 days ago

Multiplex profit drops a third as revenue rises to £780m

Spate of new orders sets contractor up for three years of work
3 days ago

Galliford Try and Breheny land latest Sizewell C road deals

More infrastructure deals for new nuclear power station
3 days ago

Worker trapped in collapsed septic tank pit

Contractor and director fined after worker suffers multiple fractures
3 days ago

Homes England buys stalled Broad Marsh site

Demolition to finally be completed as developer hunt begins
3 days ago

Vistry go-ahead for 353 homes at Rochester Riverside

Work to start on next phase of Kent town regeneration at end of this year
4 days ago

M&E firm J S Wright collapsed owing £19m

Trade creditors hit for £11.4m by employee-owned Midlands firm
4 days ago

Right to work checks to be extended to self-employed

Government plans crackdown on illegal working and rogue employers
4 days ago

Midlands developer turns to London with £1bn resi schemes trio

SevenCapital plans 1,000 flats in Kensington, Islington and the Isle of Dogs projects
4 days ago

Contractor services