Leeds leads levelling up construction rebound

Aaron Morby 3 years ago
Share

England’s main regional cities are set for further strong growth after a strong bounce back in building projects last year driven mainly by big residential schemes.

Leeds skyline. Pic courtesy: ARC Aerial Imaging
Leeds skyline. Pic courtesy: ARC Aerial Imaging

Construction activity across Birmingham, Leeds and Manchester rose markedly with 65 new projects beginning construction last year, up from 47 in 2020, according to Deloitte’s Regional Crane Survey.

Leeds led the way with both record growth in residential, student and office schemes.

The construction of new residential development was strong in Manchester and Birmingham last year, while hitting record levels in Leeds. Across the three cities, the construction of 19,763 new homes was underway in 2021 – the second highest on record.

Project threshold: office: +25,000 sq ft; hotel: +35 beds; retail/leisure: 10,000 sq ft; residential: 25 units; education: +10,000 sq ft

Similar to residential growth trends in Manchester since 2014, Birmingham and Leeds have now also gained significant traction in new build to rent projects over successive survey years.

Once booming Manchester is showing a decline from high construction levels across all sectors. But over 2.8m sq ft of office floor space is planned to commence construction over the next few years offering a bright outlook for the commercial sector.

The Survey monitors construction activity across a range of sectors including offices, residential, hotels, retail, education and student housing – providing a barometer of developer sentiment and future supply.

Daniel Barlow, managing partner for regional markets at Deloitte, said: “It’s encouraging to see overall construction activity remaining resilient across regional cities, despite a number of challenges.

“Regional cities are gearing up for a good pipeline of development for 2022. There is expected to be an uplift in construction across all sectors, as the levelling up agenda progresses, with further investment in centres.”

Vital city statistics


Birmingham:

  • Development in the city was a mixed picture dependent on sector, with residential development remaining strong and over 750,000 ft of new office space delivered to market in 2021.
  • 18 new projects broke ground in 2021, up from 10 in 2020
  • There were 14 new resi starts during 2021, up from five the year before.
  • The amount of office space under construction (616,661 sq ft) has halved compared to the 1.25m sq ft recorded at year end 2020. However, delivery was the second highest on record with 751,664 sq ft brought to market during 2021, much of which was pre-let.
  • After a record 1,458 beds completing in 2020, the amount of purpose-built student accommodation is subdued, with 337 bedspaces under construction and 399 brought to market during 2021.

Leeds:

  • Over all sectors, Leeds saw 22 total new starts in 2021 – the second highest number of new starts in the history of the survey.
  • 2021 saw a record 10 new residential developments starting construction, which will deliver 2,267 new homes. This represents an increase of 210% when compared with the 732 new residential units that started construction in 2020.
  • Despite only 82,389 sq ft of new office space being delivered in 2021, Leeds saw five new starts in the sector. This contributed to over 860,000 sq ft of space under construction in 2021, across seven sites – well above the survey’s four-year average of 704,100 sq ft.
  • The survey reports a surge in the construction of student accommodation, with six new starts and 2,226 bedspaces currently under construction.
  • The retail, leisure and hotel sectors were subdued in 2021. There were no retail or leisure new starts, and one hotel new start.

Manchester:

  • While the overall number of new starts in 2021 (25) remains consistent with 2020, there was an overall reduction of volume of new homes, offices and hotels under construction in Manchester and Salford.
  • 5,549 new homes were delivered in 2021, after 4,914 new homes were delivered in 2020, following consecutive record-breaking years. 10,717 residential properties remain under construction in the survey area across 40 development sites.
  • Commercial office supply was constrained compared to typical years (537,475 sq ft per annum between 2014-2021), with four commercial office schemes completing in 2021 and delivering just 404,584 sq ft to market. 43% of 1.34 million sq ft under construction is currently pre-let, providing further short-term constraints on supply for potential occupiers.
  • 938,876 sq ft of new education and research floorspace was completed in 2021, which is the largest amount delivered on record and supported by the opening of the Manchester Engineering Campus. A further 506,018 sq ft remains under construction in this sector.

Latest news

Ridge buys rival consultant Jubb

Acquisition will see 100 new staff join Ridge
5 hours ago

Enabling works to start £130m Huyton town centre regen

Phase one includes a new council HQ, hotel and 72 flats
5 hours ago

Grainger build to rent pipeline rises to £1.4bn

Rental specialist buys sites in Sheffield and Cardiff to build 600 rental homes
5 hours ago

Kier wins Cambridgeshire County council estate upkeep

Firm will provide building and M&E services to 106 buildings across the county
5 hours ago

Louvres and solar shading specialist files for administration

Hampshire based ALPS lodges court notice after 25 years in business
6 hours ago

Speedy Hire posts a loss in latest results

Hire giant confident of better performance in next six months
6 hours ago

Esh to lead next phase of Riverside Sunderland regeneration

Infrastructure work will allow further development of Sheepfolds area
5 hours ago

Green light for £1.3bn Edinburgh coastal town revamp

First phase of Granton Waterfront scheme will see Cruden Homes create a new community
22 hours ago

Vistry chief operating officer steps down

Earl Sibley exits as his COO role axed for more direct reporting to CEO
1 day ago

House builder Camstead goes into administration

Work stopped on three current sites
2 days ago

Death of piling legend Roger Bullivant

Industry innovator dies after long illness aged 85
1 day ago

ESS Modular went down owing suppliers £7m

Modular specialist owned by ISG owner Cathexis
1 day ago

Builders back farmers in inheritance tax protest

"A rethink is desperately needed" say National Federation of Builders
1 day ago

Willmott Dixon wins £36m leisure centre upgrade

Work to start on historic Westminster 1930s Grade II listed Seymour Centre
1 day ago

Graham wins £100m Cardiff Crossrail phase 1

Work on route to Cardiff Bay to start before end of next year
2 days ago

Laing O’Rourke appoints new European MD

Peter Lyons to take-up new role in February
3 days ago

Profits dip at Stepnell ahead of demerger

Turnover and secured workloads up ahead of restructure
3 days ago

HS2 green bridge deck takes shape

100m-wide wildlife bridge to carry hedgerows and country lane over HS2
2 days ago

1,000-home Wolverhampton city centre scheme in for planning

ECF and council advance City Centre West build to rent scheme
3 days ago

Sisk clinches £54m North London council HQ revamp

Haringey's iconic Grade II listed civic centre to be brought back into use
3 days ago

Ofgem approves £2.5bn Eastern Green Link 1

Work to start next Spring on cable project from Scotland to the north of England
3 days ago

Anglian Water hunts for £1bn delivery partner

Programme delivery partner wil integrate with client team over 15-year plan
3 days ago

Hadden collapse costs supply chain £6.7m

"Highly unlikely" subcontractors will receive anything for their unpaid invoices
3 days ago

Management buyout at M&E specialist

£25m turnover Kimpton in second MBO in its 60-year history
3 days ago

BAM finalises £71m deal to replace first major RAAC school

Work to start on new St Leonards Catholic School in Durham
3 days ago

Scaffolder hit by two tonne weight at nuclear plant

Court hands out £633,000 in fines after Dungeness B decommissioning incident
3 days ago

Go-ahead for 860,000 sq ft East London medical campus

Whitechapel Road scheme of six new and repurposed buildings
3 days ago

Site labour rates hit record high as cost inflation returns

Industry's biggest payroll firm says rates rose nearly 5% last month in London
6 days ago

Morris & Spottiswood acquires part of ISG fit-out division

ISG Cathedral acquisition saves 111 jobs and expands presence across England
7 days ago

New work drives Q3 construction output uplift

Third quarter activity up 0.8% despite slowdown in September
6 days ago

Contractor services