Tall building plans across London hit record levels

Grant Prior 3 years ago
Share

Permissions granted for tall buildings above 20-storeys in London hit record levels last year.

The latest edition of the annual New London Architecture (NLA) London Tall Buildings Survey, published in partnership with global property consultancy Knight Frank show there were 98 full planning permissions granted in 2021 – 26% higher than in 2020 and the highest annual figure on record.

Some 56% of permissions were granted in outer London boroughs, including a combined 34 in Newham and Brent.

The high level of permissions granted reflects the bumper crop of applications submitted in 2018 and 2019 which continue to work their way through the system with 51% of consents last year for plans submitted in 2019 or earlier.

The pipeline of 20-storey plus buildings in the capital contracted 1% year-on-year in 2021, while the number of new planning applications put forward by developers as well as new construction starts, both bellwethers for the state of the market, came in lower than long-term trends.

Stuart Baillie, Head of Planning at Knight Frank commented: “Context is essential; the future pipeline may have contracted slightly, but it remains significant. In total, there are 583 tall buildings which are proposed or approved with 109 of those currently under construction, 28% and 19% higher than back in 2016 respectively.”

The average height of tall building applications put forward in 2021 was 28 storeys, with an average of 31 storeys for applications across inner London boroughs to an average of 25 storeys in outer London.

In 2021, a total of 29 tall buildings commenced construction. While this was an increase on 2020, it represents the second lowest level of new starts for tall buildings across London since 2013.

A drop in new starts is consistent with the decline seen in the wider London development market over the last couple of years, while rising build costs and ongoing supply chain disruption is likely to have put a hold on some projects last year especially given the higher costs associated with building tall.

Baillie added: “It should be London’s ambition to be a world leader in delivering exceptionally-designed and highly sustainable tall buildings – and the construction industry plays a vital part in achieving this goal.

“With this in mind, we should not focus on the quantity of tall buildings coming forward, but rather the quality. It is crucial that any tall building delivered not only positively contributes to the economy and sustainability of the capital, but also meaningfully adds value to its local context.”

Latest news

Buyers flag fears over civil engineering slowdown

All sectors in reverse during "challenging" March
7 hours ago

Torsion and Khalbros to build new Leeds £1bn neighbourhood

Eastgate Quarter site acquired from Hammerson
1 day ago

Winners named for £380m Scottish council housing upkeep deal

PfH Scotland names 38 firms for social housing landlord deal
11 hours ago

Kier wins first phase of £700m Warwick Uni campus build

Firm to start work on science and engineering precinct last this year
1 day ago

JCB to double size of US factory in wake of Trump tariffs

$500m Texas factory under construction to expand to 1m sq ft
1 day ago

Green light for £2.4bn Luton Airport expansion

Government go-ahead to transform airport
1 day ago

Mivan looks to boost supply chain network

Subcontractors and suppliers invited to meet the buyer event: Book places now
12 hours ago

Diversification pays off for concrete frame specialist Statom

Strong results as £180m turnover firm expands into infrastructure sector
1 day ago

Cardo in talks to buy Breyer roofing arm

More than 100 jobs could be saved at Breyer Roofing
1 day ago

Quartet win £750m Wales & Western railway deal

Network Rail confirms partners for Reactive and Minor Works framework
1 day ago

Plans in for £350m London Bridge life sciences hub

Snowsfields Quarter will consist of three buildings containing labs
1 day ago

Surging labour costs push tender price forecast up

Pick-up in tender prices despite weak growth
1 day ago

Permasteelisa wins cladding deal on Multiplex city tower

Facade specialist wins work on Fenchurch Street ‘hanging gardens’ tower
1 day ago

Wates wins fit-out for Manchester First Street Hub

Smartspace arm secures another Government hub deal
2 days ago

Peel Ports reveals winners for £750m framework

18 firms win places on deal: Full list
2 days ago

Big trade names dropped in M Group rebrand

Acquisitive group formed from Morrison Utility services in 2016
2 days ago

Breyer Group files administration notice

Staff hope rival firm could buy assets and save jobs
2 days ago

Former Severfield director takes helm at Embrace Steel

New CEO Martin Kelly aims to step up expansion of steelwork contractor
2 days ago

£302m upgrade funding awarded to FE colleges – list

Cash shared out between England’s 179 college groups
2 days ago

FK Facades thrives but construction arm hit by ISG row

Dispute with failed contractor costs specialist £5.5m
2 days ago

Galliford Try gets go-ahead for Milton Keynes PRS tower

33-storey tower needs gateway 2 approval before work can start
3 days ago

Small house builders get £150m funding for green homes

Developers will have to meet-up to ten new criteria to benefit from interest rate discounts
2 days ago

Lendlease Construction renamed Bovis

US private equity firm completes £35m purchase of UK contracting business and rebrands
3 days ago

Breyer Group battles for survival as rivals circle

Housing maintenance firm fights three winding up petitions in a month
3 days ago

Careys facing £2.4m claim by developer over demolition cartel

Giant Hong Kong developer claims it was overcharged on Lots Road Power Station job
3 days ago

Multiplex profit drops a third as revenue rises to £780m

Spate of new orders sets contractor up for three years of work
3 days ago

Galliford Try and Breheny land latest Sizewell C road deals

More infrastructure deals for new nuclear power station
4 days ago

Worker trapped in collapsed septic tank pit

Contractor and director fined after worker suffers multiple fractures
3 days ago

Homes England buys stalled Broad Marsh site

Demolition to finally be completed as developer hunt begins
4 days ago

Vistry go-ahead for 353 homes at Rochester Riverside

Work to start on next phase of Kent town regeneration at end of this year
4 days ago

Contractor services