Plan to lift Chinese rebar ban to plug Russian import gap

Aaron Morby 3 years ago
Share

The Government’s influential trade advisory body is proposing to lift the ban on Chinese rebar imports amid fears of looming UK shortages and price rises.

Row flares up over plan to replace Russian and Belarus rebar imports with Chinese state-subsidised supplies
Row flares up over plan to replace Russian and Belarus rebar imports with Chinese state-subsidised supplies

The Trade Remedies Authority, a non-departmental public body of the Department for International Trade, warns there will be a fall in rebar supplies due to the war in Ukraine and sanctions against Russia and Belarus.

Rebar from Ukraine, Belarus and Russia accounts for between 20% and 40% of total UK imports.

Without action to replace these supplies, the trade authority fears rebar prices could rise steeply stoking already high construction inflation.

But the plan to drop anti-dumping measures imposed six years ago after China flooded the UK market with cheap imports from state-subsidised steel producers, has been blasted as ‘utter madness’ by the industry’s UK trade body, the British Association of Reinforcement.

Steve Elliott, BAR chairman, said: “The TRA proposals are an over-reaction and do not fully take into account the manufacturing resources of UK and European steel mills.

“In terms of the significant additional CO2 emissions from importing Chinese steel and concerns over quality, the proposals are utter madness.”

At present, the UK only has one verified producer, which is estimated to employ around 700 employees and contributes around £41m per year to the UK economy.

In contrast, the TRA identified 36 domestic importers of rebar. Just eight of these employed around 1,780 employees and contributed around £180m to the UK economy.

TRA chief executive Oliver Griffiths said: “We have a duty to weigh up the impact of dumping on UK producers against the broader effects on the UK economy of imposing tariffs.

“In this case, our assessment is that high domestic demand and international supply shortages mean that retaining tariffs on High Fatigue Performance steel reinforcement bars from China would push up prices for key elements of the UK economy, such as construction.

“Our judgement is that the impact on the British economy of higher prices would significantly outweigh the impact on the sole UK producer of rebar of removing tariffs on Chinese imports.”

BAR contends that there is more than enough steel producing capacity in the UK and Europe.

Elliott said that in addition to harming the UK steel industry, it was important to give consideration to the CO2 impact of importing Chinese steel and to safety concerns over quality.

He said that in addition to the CO2 from global transportation, Chinese steel is often manufactured using Basic Oxygen Furnaces which produce up to five times the amount of CO2 compared to the Electric Arc Furnace methods used by UK and European steel mills.

Elliot added that there were also ongoing quality concerns.

In 2015, it was found that some Chinese steel mills were adding boron to steel reinforcement in order to obtain commercial rebates.

Even small amounts of boron can affect the hardenability characteristics of steel and this has potential safety issues for prefabricated welded steel reinforcement.

TRA has published its proposals and invited responses before producing a final recommendation that will be sent to the Secretary of State for International Trade who will make the final decision on whether to uphold the TRA’s recommendation.

Latest news

Bowmer & Kirkland boosts margins as profits surge to £69m

Revenue nudges up towards £1.3bn in year of expansion
4 hours ago

Offshore construction starts on £4bn windfarm

Foundations for first of 95 turbines installed: Watch video
3 hours ago

AECOM buys civils consultant Allen Gordon

Global giant acquires Scottish water and energy specialist
3 hours ago

Plans in for £1bn Northern Gateway site in Manchester

Plan for 500-acre manufacturing and logistic park advance
3 hours ago

RED wins £31m London Shoreditch student digs job

Two extra floors will be added to Willen House scheme
4 hours ago

Deconstruct handed £12m Grenfell demolition

Firm maintaining building awarded job without bid race to speed process
4 hours ago

Sizewell site workers get made to measure PPE

Bespoke fitting service on offer at new Bryson branch
4 hours ago

Comment: Gateway is acting like a barricade

Contractors left banging their heads on an (unbuilt) brick wall
3 days ago

Final phase of £1.5bn Elephant and Castle revamp hits planning

Get Living submits revised plan for 500 homes and 450-bed student block
4 days ago

Ealing backs final phase of £1.3bn estate rebuild

Friary Park estate rebuild in Acton reaches end stage
3 days ago

Green light for scaled-down Nottingham student tower

Glasshouse Street scheme will deliver 247 student rooms
3 days ago

Aston Villa to revamp North Stand

Club to reuse existing structure rather than complete rebuild
4 days ago

Mace signs ex-ISG director to lead Euro health and tech push

Gary Sweeney to head up healthcare and life sciences consultancy arm
3 days ago

Sir Robert McAlpine claws way back into profit

Firm says return to profit and strong cash balance validates new strategy
4 days ago

Severfield to cut staff by 6% amid pricing pressure

Steelwork contractor warns of extended tighter pricing due to project delays
4 days ago

JRL completes sale of 50% stake to Malaysian giant IJM

Deal boosts balance sheet and kicks starts growth plan
4 days ago

Green light for £100m Liverpool Baltic station build

Enabling highway works to start in the autumn
5 days ago

First live tests for flying construction robots

Drones can lay construction materials at height on site
4 days ago

Three firms land £170m Gentoo Sunderland housing deal

PHS Solutions, Esh and RE:GEN to deliver 10-year home upgrade plan
5 days ago

Gateway gridlock hits build-to-rent delivery as starts nosedive

Build to rent starts plunge 18% in the capital
5 days ago

Call to shift Gateway 2 checks to end building bottleneck

"The current system isn't working but we all want to see safe buildings"
5 days ago

GBN launches £600m bid race for SMR engineer roles

Owner engineers to provide technical and assurance services
5 days ago

Wates hires ex-Homes England chief to head public sector push

Robert Stone to spearhead its public sector and national frameworks strategy
5 days ago

Acheson Construction collapse costs suppliers £8.5m

One frustrated creditor seized a telehandler after contractor went into administration
6 days ago

Dominus wins go-ahead for 173-bed Glasgow scheme

Old Wynd Street job expected to cost around £25m to build
6 days ago

Safety Regulator misses deadline to clear Gateway 2 backlog

Investors pulling out of funding high rise buildings
6 days ago

CITB still sitting on £95m cash pile

Staff numbers jump from 666 to 763 as training body wage bill soars
6 days ago

£500m road surfacing framework market call

NEPO goes out to consultation on north east regional highways deal
6 days ago

Two share £220m Scottish rail repairs and minor works deal

AmcoGiffen and CPMS win civils and building repair deals
6 days ago

Builder wanted for £60m London leisure and flats job

Tower Hamlets aims to replace St George’s Leisure Centre in Shadwell
6 days ago

Contractor services