Gove invites Kingspan for talks on fire safety compensation

Aaron Morby 2 years ago
Share

Housing secretary Michael Gove has written to the chairman of insulation firm Kingspan to invite him in for talks about paying for remediation works where Kooltherm K15 insulation was used.

The move marks the next step in forcing developers and the supply chain firms to contribute towards tackling the building safety crisis in high-rise flats.

In a strongly worded letter to chairman Gene Murtagh, Gove writes: “I have long argued that those who manufactured flammable products and sold them have a moral and financial imperative to recognise their role in the proliferation of unsafe buildings.

“The testimony at the Grenfell  Tower inquiry uncovered shameful practices and an abhorrent culture of disregard for the safety of residents in their homes.

“I was appalled by the evidence heard by the enquiry about the reckless and deceptive behaviours within your company.”

His letter was prompted by a report in the Observer newspaper suggesting that Kingspan was willing to pay where its products were inappropriately used on buildings.

 

Gove added: “I sincerely hope this is a first step only, in what should be a comprehensive package of financial support from Kingspan and other product manufacturers.

“Your record trading profit of £382.8m will, I presume, help to fund this commitment.

“Those companies who do not share our commitment to righting the wrongs of the past must expect to face commercial consequences.

“I look forward to hearing from you before Easter.”

In response, Kingspan issued a statement this morning saying that its K15 insulation was safe to use when installed correctly in appropriate external wall systems.

This had been underlined by recent BSI guidance (PAS 9980), sponsored by the UK Government, which supported the retention of K15 in appropriate circumstances.

It added: “Kingspan continues to stand by our commitment:

  • pay our share of remediation costs where we have responsibility for the inappropriate use of K15 in a high-rise residential building, and its safe retention cannot be supported by testing.
  • To contribute to an appropriate joint Government and industrywide funding mechanism such as an industry levy, that is equitable and shared across the entire construction industry, to support the wider fire safety issues on buildings where those responsible can’t or won’t pay.
  • We are also committed to constructive dialogue and welcome further engagement with our trade associations and the Department.

Kingspan added: “Expert evidence at the Inquiry demonstrates that the Arconic cladding panels on the exterior of the building – which were not made by Kingspan – were the entirely dominant factor in the nature and speed of the spread of the Grenfell Tower fire, not the combustibility of the insulation.

“Kingspan did not supply or recommend the use of its K15 insulation on the Grenfell Tower refurbishment, which made up only 5% of the insulation layer purchased for use and was entirely inappropriate for use in a cladding system with a polyethelene-cored ACM.”

Latest news

Pension fund charges hit profits at Wates

Bottom line also hit by closing out construction contracts
5 hours ago

Construction worker dies on Essex site

Fatal accident at housing job run by Rose Builders
3 hours ago

Renamed Bovis Construction suffered £16m loss last year

Firm slumped into red before being sold to US group Atlas Holdings
8 hours ago

Plans in for £1bn Liverpool Street Station scheme

21-storey offices above station main concourse to help fund upgrade
9 hours ago

Project director leaves giant McAlpine car battery site

Change in site team at flagship £4bn Agratas factory
9 hours ago

Nexus Infrastructure orders up 11% at half-year

Tamdown housing civils arm orders up despite housing recovery delay
8 hours ago

Five firms win £450m Scottish electricity network upgrade

Major investment by Energy company SSEN Distribution
1 day ago

Private equity firm buys trio of marine construction specialists

Move will create a new national marine infrastructure group
8 hours ago

Firm wanted for £35m Royal Observatory revamp

Upgrade includes new pavilion and energy saving measures
23 hours ago

Wates wins £111m Victoria Tower restoration

Palace of Westminster's tallest tower overhaul will take six years
1 day ago

Cappagh Group founder passes away

Tom Ferncombe founded utility and infrastructure contractor in 1973
1 day ago

Mace tops contracts league with Euston Tower win

Contractor leads monthly work haul for second month running
1 day ago

Police hunt boss on the run after site manslaughter charge

Company director fails to turn up to court to face safety charges after site death
2 days ago

Glasgow civils firm buys building refurb specialist

M Squared buys EBS Construction in move to target £25m sales
1 day ago

Lynch plant hire fined £800,000 over abnormal load

Travelling excavator caught in police clampdown
1 day ago

Buyers flag fears over civil engineering slowdown

All sectors in reverse during "challenging" March
4 days ago

Police recover £100,000 of stolen plant at Harwich port

Polish man arrested on suspicion of handling stolen goods
1 day ago

Winners named for £380m Scottish council housing upkeep deal

PfH Scotland names 38 firms for social housing landlord deal
4 days ago

Torsion and Khalbros to build new Leeds £1bn neighbourhood

Eastgate Quarter site acquired from Hammerson
5 days ago

Kier wins first phase of £700m Warwick Uni campus build

Firm to start work on science and engineering precinct last this year
5 days ago

JCB to double size of US factory in wake of Trump tariffs

$500m Texas factory under construction to expand to 1m sq ft
5 days ago

Green light for £2.4bn Luton Airport expansion

Government go-ahead to transform airport
5 days ago

Mivan looks to boost supply chain network

Subcontractors and suppliers invited to meet the buyer event: Book places now
4 days ago

Diversification pays off for concrete frame specialist Statom

Strong results as £180m turnover firm expands into infrastructure sector
5 days ago

Cardo in talks to buy Breyer roofing arm

More than 100 jobs could be saved at Breyer Roofing
5 days ago

Quartet win £750m Wales & Western railway deal

Network Rail confirms partners for Reactive and Minor Works framework
5 days ago

Plans in for £350m London Bridge life sciences hub

Snowsfields Quarter will consist of three buildings containing labs
5 days ago

Surging labour costs push tender price forecast up

Pick-up in tender prices despite weak growth
5 days ago

Permasteelisa wins cladding deal on Multiplex city tower

Facade specialist wins work on Fenchurch Street ‘hanging gardens’ tower
5 days ago

Wates wins fit-out for Manchester First Street Hub

Smartspace arm secures another Government hub deal
6 days ago

Contractor services