Gove invites Kingspan for talks on fire safety compensation

Aaron Morby 1 year ago
Share

Housing secretary Michael Gove has written to the chairman of insulation firm Kingspan to invite him in for talks about paying for remediation works where Kooltherm K15 insulation was used.

The move marks the next step in forcing developers and the supply chain firms to contribute towards tackling the building safety crisis in high-rise flats.

In a strongly worded letter to chairman Gene Murtagh, Gove writes: “I have long argued that those who manufactured flammable products and sold them have a moral and financial imperative to recognise their role in the proliferation of unsafe buildings.

“The testimony at the Grenfell  Tower inquiry uncovered shameful practices and an abhorrent culture of disregard for the safety of residents in their homes.

“I was appalled by the evidence heard by the enquiry about the reckless and deceptive behaviours within your company.”

His letter was prompted by a report in the Observer newspaper suggesting that Kingspan was willing to pay where its products were inappropriately used on buildings.

 

Gove added: “I sincerely hope this is a first step only, in what should be a comprehensive package of financial support from Kingspan and other product manufacturers.

“Your record trading profit of £382.8m will, I presume, help to fund this commitment.

“Those companies who do not share our commitment to righting the wrongs of the past must expect to face commercial consequences.

“I look forward to hearing from you before Easter.”

In response, Kingspan issued a statement this morning saying that its K15 insulation was safe to use when installed correctly in appropriate external wall systems.

This had been underlined by recent BSI guidance (PAS 9980), sponsored by the UK Government, which supported the retention of K15 in appropriate circumstances.

It added: “Kingspan continues to stand by our commitment:

  • pay our share of remediation costs where we have responsibility for the inappropriate use of K15 in a high-rise residential building, and its safe retention cannot be supported by testing.
  • To contribute to an appropriate joint Government and industrywide funding mechanism such as an industry levy, that is equitable and shared across the entire construction industry, to support the wider fire safety issues on buildings where those responsible can’t or won’t pay.
  • We are also committed to constructive dialogue and welcome further engagement with our trade associations and the Department.

Kingspan added: “Expert evidence at the Inquiry demonstrates that the Arconic cladding panels on the exterior of the building – which were not made by Kingspan – were the entirely dominant factor in the nature and speed of the spread of the Grenfell Tower fire, not the combustibility of the insulation.

“Kingspan did not supply or recommend the use of its K15 insulation on the Grenfell Tower refurbishment, which made up only 5% of the insulation layer purchased for use and was entirely inappropriate for use in a cladding system with a polyethelene-cored ACM.”

Latest news

McAlpine healthcare MD joins BAM as Northern chief

Mark Gibson joins as Northern regional director
2 days ago

HS2 Align JV completes Britain’s longest rail bridge – video

Final deck segment sees HS2 viaduct break 137-year old record held by Tay Bridge
2 days ago

Green light for major London city fringe office retrofit

Overhaul of 30 Finsbury Square to start next Summer
2 days ago

John Lewis submits plan for £80m Reading rental flats scheme

Construction hoped to start on 215 flats scheme at the start of 2026
2 days ago

Balfour Beatty lands £27m Highlands flood defence scheme

Work to start imminently building river walls in Comrie
2 days ago

Buyers believe construction has “turned a corner”

Residential rebounds, commercial still strong but civils slows
3 days ago

Vistry unseats Barratt as Britain’s biggest house builder

Partnership homes specialist on track to build 18,000 homes this year
3 days ago

23 jobs axed as Lincolnshire contractor goes under

C G Godfrey provided civils and M&E services in Eastern England
3 days ago

Winvic first to use remote-control tower crane on site

Crane driver sits in ground floor command centre at Birmingham 33-storey tower
3 days ago

Starmer vows to ban Grenfell firms from public contracts

Prime Minister to write to named and shamed construction firms
3 days ago

Grenfell Inquiry calls for uber construction regulator

Shake-up must include licensing of main contractors taking on high rise projects
4 days ago

Robertson to restore historic Newcastle market

Work to revamp Grainger Market to start by the end of this month
3 days ago

Three bidders chase £1.4bn Midlands rail hub alliance

Balfour, Skanska, Bam and Laing O'Rouke in bidding for eight-year rail upgrade
4 days ago

Barratt profit nosedives as margin slumps to 4.2%

Fire safety provisions jump by an extra £126m to total £628m
4 days ago

First viaduct completed on HS2: Video site report

Eiffage, Kier, Ferrovial Construction and Bam Nuttall finish 163m long Highfurlong Brook Viaduct
4 days ago

Bouygues bags £28m Oxfordshire school job

St John’s Academy to be at heart of Wellington Gate Development
4 days ago

Willmott Dixon wins £49m Wigan college expansion

New campus for Wigan & Leigh College to be net zero in operation
4 days ago

Work to start on Liverpool office to flats job

Truman D&B wins resi conversion in Moorfields district
4 days ago

Government mothballs plan to scrap CE Mark

Building safety minister warns there is insufficient capacity in present testing regime
5 days ago

Government backs record number of clean energy projects

131 projects will produce electricity to power 11 million homes.
5 days ago

Tube station housing plan gets Government green light

Plans to transform Cockfosters Tube station were blocked by previous regime
5 days ago

Go-ahead for Bristol Temple Quay hotel and build to rent job

A trio of blocks will house a 230-room hotel, 170-room apart-hotel and 100 rental flats
5 days ago

Construction costs cut for Plymouth city centre revamp

Price of Armada Way scheme falls to £30m after exploratory work on site
5 days ago

Tilbury Douglas chief Paul Gandy to step down

Craig Tatton to take on CEO role from November
6 days ago

Local pressure unblocks £240m Oxford sewage works upgrade

Council warns Thames Water delay is halting building of thousands of new homes
6 days ago

Knights Brown bags last phase of £86m Portsmouth flood defence job

Contractor has already completed second and third phases of North Portsea Coastal Scheme
6 days ago

Bidding starts for £1bn housing decarbonising framework

National housing energy efficiency retrofit deal will come into force in 2015
6 days ago

World’s strongest land-based crane launched

Mammoet crane will help build major energy and infrastructure projects
6 days ago

Big Yellow gets go-ahead for largest London site

Storage giant to build 176,000 sq ft scheme next to Kensington Olympia
6 days ago

Worker dies after being buried by trench collapse

Court hears workers on new build housing site had no training on working within excavations
6 days ago

Contractor services