McGee to reuse structural steel in major office rebuild first

Aaron Morby 2 years ago
Share

Engineering contractor McGee is preparing to reuse structural steel dismantled from a grade II-listed City office block overhaul in London for new build elements of the same complex scheme.

Three facades of Cripplegate House will be stripped away and replaced by a new 12-storey structure offering 150,000 sq ft of space
Three facades of Cripplegate House will be stripped away and replaced by a new 12-storey structure offering 150,000 sq ft of space

The firm claims this reuse of major steel sections on the same project is a first for construction, allowing some 96% of the steelwork to be retained on the complex rebuild.

Developer Castleforge has appointed McGee to carry out deconstruction works for the 1 Golden Lane project at Cripplegate House in the City of London.

McGee has used its carbon engineering expertise to develop an approach that allows the deconstruction and de-fabrication of the existing structural steelwork from the 1980s building, allowing it to be recertified, refabricated and reused in the new proposed structure.

This pioneering approach is being used because cuts more carbon emissions than other structural solutions on the project that involves retaining one elevation of the 1894 original building facade.

Around half the original building will be retained with substantial demolition and rebuild of the remaining offices behind.

The proposed refabrication involves ribbon cutting the existing beams to increase the stiffness of section, something which has never previously been done on a reused steel section.

McGee worked with the designers, industry bodies and Castleforge to demonstrate the viability of steelwork reuse in this scheme to reduce the carbon emissions and ensure the protection of the original building.

In addition, McGee will undertake structural demolition of some existing RC slabs, the roof and the façade of the building.

Prosed new upper levels of repurposed Cripplegate House taking project to 12 storeys

Seb Fossey, group managing director, said: “This is the first time that any project in the UK is targeting exact steelwork sections to be deconstructed, de-fabricated, recertified and refabricated for use in the redevelopment of the same site.

“It is our hope that by successfully delivering this scheme it will demonstrate that technical solutions around steelwork reuse are commercially viable for future schemes in The Capital.

“I’m delighted that Castleforge has put their trust in the experience of our team to deliver this UK first. We are committed to enabling lower carbon solutions through our high value engineering solutions.”

Oliver Vickerage, Development Manager at Castleforge said: “1 Golden Lane is set to pioneer innovation in sustainable development of stranded City assets.

“Our alignment on a RetroFirst approach has enabled the retention of 96% of the existing structure. The innovative ribbon cutting algorithm developed as part of this project, enabling the augmentation of steel sections to the required depths will massively increase the opportunity for steel re-use in a market expectant of symmetry and clean lines.”

The professional design team includes: Hawkins/Brown (Archietct); London Structures Lab (Structural Engineering); Arup (Services Engineering, Energy/Sustainability, Air Quality, Circular Economy); Trigon (Fire Safety Engineering); Blue Sky Buildings (Construction Management); and Gardiner & Theobald (cost management).

 

Latest news

Fraudsters jailed after £22m construction tax scam

Gang sentenced after bogus payroll firm failed to pay VAT and CIS money to revenue
1 hour ago

MPB clinches substructure for HS2 Curzon Street station

Contracts for station superstructure to be let in coming months
17 hours ago

Flood defence spend rises to record £2.65bn over two-years

Key projects mapped as Government injects extra £250m to shore up defences
29 mins ago

Turnaround strategy continues to pay off for Careys

Profits continue to rise as £50m investment plan in full swing
18 hours ago

All change on £800m Eastern Highways Alliance

Octavius and Winvic sweep up all three lots in new line-up
28 mins ago

Vinci bags first phase of £350m Stockport scheme

Contractor edges-out Willmott Dixon to start major mixed-used project
18 hours ago

Crest Nicholson slumps to £144m loss

Incoming CEO review unearths further writedowns on fire remediation and closed divisions
1 day ago

Piling job cuts loom over safety regulator project delays

Bottleneck in high rise project approvals hits demolition and foundation firms
2 days ago

Developer Ghelamco swaps to self delivery for Battersea tower

John F Hunt no longer part of project team on 24-storey resi scheme
2 days ago

Pagabo starts renewal race for two mega frameworks

Contractors and developers asked for input on reshaping deals worth billions
1 day ago

Giant HS2 viaduct deck slide breaks records: Video

EKFB consortium oversees four-day installation
1 day ago

Ferrovial lands £230m National Grid tunnel

Work to start shortly on Grain to Tilbury electricity infrastructure upgrade
2 days ago

Tax-row tunnellers down tools on Balfour Hinkley job

Lodge allowance tax dispute hits tunnelling site
2 days ago

Go-ahead for Square Mile’s fifth tallest tower

Multiplex set to start 99 Bishopsgate job late next year
2 days ago

New £4.5bn funding model for stalled London rail schemes

Residential TIF funding offers key to unlock Bakerloo and DLR extensions
2 days ago

Speedy Hire latest to be hit by slow CP7 rail spending

Plant-hire firm flags issues with latest Network Rail spending round
2 days ago

FM Conway family chair steps away from business after Vinci deal

Joanne Conway steps away as Andrew Hansen becomes MD
2 days ago

Manchester Hotspur Press mill scheme rescued

37-storey student tower will now go-ahead
2 days ago

Watkin Jones to advance 260-room London aparthotel

Development deal for New Kent Road project
4 days ago

Plan for film studios switched to data centre cluster

Plans in for six data centre buildings in Buckinghamshire
6 days ago

Hunt for firm to deliver £75m Cambridge Civic Quarter

Work includes £41m Guildhall and £21m Corn Exchange revamps
5 days ago

Plans in for £200m Middlesbrough regen scheme

Wates is lined up to deliver landmark Gresham rental homes scheme
5 days ago

£600m Bristol shopping centre redevelopment approved

Galleries centre will be demolished for homes and offices quarter
5 days ago

Ant Yapi lands ultra prime London homes job

Prestige scheme replicates Regency mansions around nearby Regent’s Park
5 days ago

CITB survives another review

Report published after two more years talking about skills crisis
6 days ago

Strucktor wins record M&E package from Ardmore

Major subcontract on £240m Tribeca life science development
5 days ago

Over 800 high-rise resi jobs stalled by safety regulator

Building safety regulator project logjam hits Government growth plan
6 days ago

McAlpine under fire after another panel comes loose from hotel

High winds cause more problems at recently completed Woking hotel
7 days ago

McGee starts demolition for £500m South Bank scheme

Former ITV studios will be replaced by two office towers
6 days ago

Four arrested after hospital construction site burglary

Damage and copper wiring stolen at Hinckley and District General Hospital new building
7 days ago

Contractor services