O’Rourke to switch to low carbon concrete on all sites

Grant Prior 2 years ago
Share

Laing O’Rourke is switching to low carbon concrete on all of its new UK projects.

The move applies to all new projects that begin main construction from this month and follows a long-term research programme showing that a range of low carbon concrete options can be successfully deployed on projects as a like-for-like substitute for traditional concrete.

Research has involved Laing O’Rourke and Innovate UK working with the University of Cambridge and Sheffield University’s Advanced Manufacturing Research Centre (AMRC).

The overall carbon reduction will be 28% when compared with the company’s concrete usage in 2022.

Cathal O’Rourke, Laing O’Rourke’s Chief Operating Officer, said: “We’ve committed to being a net zero company before 2050 and we are looking at every possible measure to accelerate our progress. In construction, the greatest challenge is reducing scope 3 emissions – the embodied carbon in purchased materials.

“Reducing all carbon emissions is a priority for our business. The built environment makes a significant contribution to global warming and constructors must work with clients and design partners to deploy new technologies and innovations that make modern methods the norm and enable us to build in less carbon intensive ways.”

Construction Minister Nusrat Ghani said: “Reducing carbon emissions from concrete is essential to achieving net zero carbon by 2050.

“I’m pleased to see the leadership Laing O’Rourke is showing, through innovating and adopting the use of low-carbon concrete on all the construction projects it delivers”.

Rossella Nicolin, Head of Sustainability for Europe, said: “The expertise of our in-house concrete technologists, the experts who operate our advanced manufacturing facility in Nottinghamshire, and our supply chain partners, have all contributed to this significant step forward.

“Last year, 43 per cent of the concrete products we manufactured for our live projects were low carbon.

“It’s exciting to think this will rise to 100 per cent this year, and that very soon all our new projects will only use low carbon concrete. I want to thank the team whose hard work has made it possible.”

Laing O’Rourke’s low carbon concrete uses lower carbon alternatives to Portland cement.

These include GGBS (Ground Granulated Blast-furnace Slag) and PFA (Pulverised Fly Ash), both of which are industrial by-products with a much lower carbon footprint.

O’Rourke’s ongoing research programme focuses on wider scale deployment of cement-free options, which are ultra-low carbon, and it expects to introduce more of these materials going forward.

Latest news

Wates boss returns after collapse of his own contractor

Paul Nicholls was head of the failed Real construction group
7 hours ago

New Fair Payment Code goes live today

Latest bid to get subcontractors and suppliers paid within 30 days
10 hours ago

Lincolnshire concrete supplier files administration notice

Ever Readymix Concrete & Screed operates three depots and a fleet of 20 trucks
11 hours ago

Graham lands first deal on Liverpool’s largest brownfield site

Contractor bags infrastructure package on 10.5 hectare site
1 day ago

Bouygues UK boss to step down

Fabienne Viala to leave after eight years at the helm
1 day ago

Galliford Try scoops £87m brace of London jobs

Firm will redevelop a prominent corner building on Sloane Street in Chelsea
10 hours ago

New HS2 boss Mark Wild starts amid prep for final TBM drives

Former Crossrail CEO starts with a sharp focus on controlling costs
1 day ago

Ten consultants land Thames Water major upgrade places

Firms will share £400m of fee work over next five years
1 day ago

Rayner ultimatum to fix all unsafe tall buildings by 2029

Recladding work must start on all 18m+ resi buildings by 2027
1 day ago

ISG administrator finds just £35m to pay down £1.1bn debt

Failed firm was set to report £148m blackhole from legacy jobs
1 day ago

Redesign needed on Colas “bridge to nowhere”

Technical challenges continue as £38m scheme faces further delays
1 day ago

Skanska UK shakes-up boardroom team

Four new board appointments as two directors step down
1 day ago

Ultra rich clamour for Mace super prime resi scheme

Topping out at £2bn 1 Mayfair scheme where homes start at £35m
1 day ago

Watkin Jones wins £48m St Helen’s affordable homes deal

Firm to build nearly 300 homes for housing association
1 day ago

Barratt sets start date for High Barnet station scheme

Latest scheme to be delivered by the £1.9bn West London Partnership
1 day ago

Investors lose £26m after M&E contractor goes under

78 private investors hit by Gallant Building Services collapse
4 days ago

First contractor call for £80bn Government mega-framework

Seven-year deal will cover construction work across all departments
5 days ago

Transport Secretary quits Cabinet

Louise Haigh resigns over stolen mobile phone revelations
4 days ago

NHS modular specialist looks to strike deal with creditors

Catfoss Group Manufacturing applies for Company Voluntary Arrangement
4 days ago

Kier bags £23m Cheadle Eco Business park job

Contractor beats rival Galliford Try to deliver Stockport council's green business park
4 days ago

Willmott Dixon wins £24m Leeds council housing scheme

Firm will build 82 council houses on site of Hough Top school
4 days ago

Welding crisis road bridges revealed

Bridge projects in Midlands, Gateshead and Cornwall impacted
5 days ago

£1bn Bishopsgate Goodsyard phase one go-ahead

London Mayor approves 550,000 sq ft office scheme above Shoreditch station
5 days ago

Costain poised for major HS2 tunnel fit out deal

Latest major deal on project due imminently
5 days ago

New builds overtake refurbs in London office market

Drop in new construction starts but developers remain bullish
5 days ago

Willmott Dixon wins £23m net zero Surrey SEND school

Hopescourt School job takes low carbon work pipeline to £1.4bn
5 days ago

£1.6m fine after mast climber crush tragedy

Court hears how worker died while unloading work platform
5 days ago

Severfield welding crisis hits five National Highways bridges

Full penetration butt welds under scrutiny as weight restrictions imposed
6 days ago

HS2 awards £3bn of track contracts

Ferrovial BAM and Colas Rail among 'rail systems' winners
1 week ago

Chinese diggers face 83.5% duty after JCB dumping complaint

Fair trade body finds UK kit prices were undercut by 23%
6 days ago

Contractor services