£300m Norwich Anglia Square scheme finally approved

Aaron Morby 2 years ago
Share

Developer Weston Homes has finally gained planning for its controversial 1,100-home Anglia Square scheme in Norwich after seven years of work on the plans.

The firm was forced back to the drawing board to completely overhaul its original proposal after the Secretary of State intervened over-turning the City Council’s previous planning approval decision to redevelop the 11.5 acre site.

Resolution to approve Weston Homes’ latest scaled-down hybrid planning application allows the developer to take over ownership of the Anglia Square site from current landowner Columbia Threadneedle.

Although there are several hurdles to be finalised, Weston Homes anticipates that now it will start the phased redevelopment within the next few months.

The £300m development will reinstate the historic street pattern that existed during the Victorian era, to deliver a new neighbourhood in the place of the old shopping centre for Norwich.

Costings


The project is expected to cost around £220m to build over four phases lasting nearly nine years

Estimated demolition costs are £14.5m, split between £5.4m between the area for the detailed planning application plus a further £9.1m for the remainder of the area in later phases .

(l-r) Existing shopping centre site in the north of the city centre and the planned housing-led redevelopment

During the construction, the development will create over 2,200 jobs.

The project will see 14 new building blocks ranging in height from 3 to 8 storeys, which are designed around inner courtyards, a public square and a network of pedestrian streets.

The new plans represent a 35% reduction in the overall floorspace, with the original 20-storey tower plan axed, and 52% of the residential dwellings now dual aspect, compared to 30% previously.

Plans for Anglia Square designed by architect Broadway Malyan

The scheme will also include 8,000 sq m of non-residential floorspace in addition to a community hub, community hall and new employment floorspace.

There will be up to 450 car parking spaces, 1,888 new cycle bays, a North/South cycle path through the site, and 200 trees planted. A further 1.2km of new hedging and ecological features contributing to an +85% biodiversity net gain.

The new scheme will deliver buildings with contrasting red, white and flint grey brick. Features will include cantilevered and ornamental balconies, pitched roofs and dormer windows.

The residential element will deliver one, two and three bedroom homes of mixed tenure, the initial phase comprised of 279 market sale, 58 social rent and 16 shared ownership properties.

A further 747 homes are included in the plans, with the final residential mix to be determined through subsequent Reserved Matters applications.

Bob Weston, Chairman of Weston Homes, said: “Weston Homes is delighted by the Resolution to Grant Planning which underlines the creation of a local ‘Grounded in Norwich’ scheme, designed by the local community of Norwich.

“We have learnt so much from this project, through going back to the drawing board, consulting locally and designing a domestic scale scheme with features led by the aspirations of the people of Norwich rather than Weston Homes.

“We are looking forward to beginning the delivery of this fantastic new development for the people of Norwich.”

Latest news

Winners revealed for £5.4bn electricity grid upgrade

SP Energy Networks unveils 19 winners - full list
18 hours ago

Malaysian property giant to buy 50% stake in JRL

IJM Land to buy into diversified £800m turnover south east contractor
24 hours ago

Fast-track skills hubs to train 5,000 extra apprentices

Plan for network of 32 skills hubs to rain construction apprentices in half the time
17 hours ago

Luxury house builder files administration notice

£31m turnover Octagon Developments Ltd lodges court notice
1 day ago

Morgan Sindall takes on £22m stalled ISG Cardiff school job

Workplan is being drawn up ahead of restart on Penarth school
1 day ago

Walker Modular wins bathroom pod deal on student tower

Sealant-free construction method helps supplier dominate student market
1 day ago

Over £600m awarded for decarbonisation projects – full lists

Over 240 public building energy upgrade projects secure cash
2 days ago

Enabling works to start on £130m Huyton town centre regen

Phase one includes a new council HQ, hotel and 72 flats
2 days ago

Ridge buys rival consultant Jubb

Acquisition will see 100 new staff join Ridge
2 days ago

Grainger build to rent pipeline rises to £1.4bn

Rental specialist buys sites in Sheffield and Cardiff to build 600 rental homes
2 days ago

Kier wins Cambridgeshire County council estate upkeep

Firm will provide building and M&E services to 106 buildings across the county
2 days ago

Louvres and solar shading specialist files for administration

Hampshire based ALPS lodges court notice after 25 years in business
2 days ago

Speedy Hire posts a loss in latest results

Hire giant confident of better performance in next six months
2 days ago

Esh to lead next phase of Riverside Sunderland regeneration

Infrastructure work will allow further development of Sheepfolds area
2 days ago

Green light for £1.3bn Edinburgh coastal town revamp

First phase of Granton Waterfront scheme will see Cruden Homes create a new community
3 days ago

Vistry chief operating officer steps down

Earl Sibley exits as his COO role axed for more direct reporting to CEO
3 days ago

House builder Camstead goes into administration

Work stopped on three current sites
4 days ago

Death of piling legend Roger Bullivant

Industry innovator dies after long illness aged 85
3 days ago

ESS Modular went down owing suppliers £7m

Modular specialist owned by ISG owner Cathexis
3 days ago

Builders back farmers in inheritance tax protest

"A rethink is desperately needed" say National Federation of Builders
3 days ago

Willmott Dixon wins £36m leisure centre upgrade

Work to start on historic Westminster 1930s Grade II listed Seymour Centre
3 days ago

Graham wins £100m Cardiff Crossrail phase 1

Work on route to Cardiff Bay to start before end of next year
4 days ago

Laing O’Rourke appoints new European MD

Peter Lyons to take-up new role in February
5 days ago

Profits dip at Stepnell ahead of demerger

Turnover and secured workloads up ahead of restructure
5 days ago

HS2 green bridge deck takes shape

100m-wide wildlife bridge to carry hedgerows and country lane over HS2
4 days ago

1,000-home Wolverhampton city centre scheme in for planning

ECF and council advance City Centre West build to rent scheme
5 days ago

Sisk clinches £54m North London council HQ revamp

Haringey's iconic Grade II listed civic centre to be brought back into use
5 days ago

Ofgem approves £2.5bn Eastern Green Link 1

Work to start next Spring on cable project from Scotland to the north of England
5 days ago

Anglian Water hunts for £1bn delivery partner

Programme delivery partner wil integrate with client team over 15-year plan
5 days ago

Hadden collapse costs supply chain £6.7m

"Highly unlikely" subcontractors will receive anything for their unpaid invoices
5 days ago

Contractor services