Firms put on alert for £1.6bn of decarbonisation frameworks

Aaron Morby 2 years ago
Share

Procurement body Pagabo has readied firms for two new decarbonisation projects frameworks set to come out to tender in September.

Both frameworks will be valued at £1.6bn and run for four years and each will have its own contracting authority.

One framework will be dedicated for healthcare schemes, with Great Ormond Street Hospital serving as a sector-specialist host.

The second framework will be hosted by Hull City Council and be open to all other sectors.

Both frameworks will offer a dozen regional lots to ensure SME and local-based supplier involvement.

Each of these regions will be separated into two main service lots:

  • Lot 1 – Retrofit Consultancy
  • Lot 2 – Main Contractor Delivery

Under Lot 1, clients will be able to appoint retrofit assessors, coordinators, designers and evaluators to provide specialist consultancy services for decarbonisation projects.

Firms will be able to provide a full business case for the delivery, then sit client-side throughout the delivery phase in a coordination role.

To be appointed to the lot, consultants will be required to hold relevant accreditations, such as PAS2035 or PAS2038 for the assessment of domestic dwellings and commercial buildings for energy retrofit.

Under Lot 2, main contractors will be appointed to provide a complete business solution for clients.

Lot 2 will be split into four value bands

  • Lot 2a – £250k to £1m
  • Lot 2b – £1m to £5m
  • Lot 2c – £5m to £15m
  • Lot 2d – £15m and above

The general building decarbonisation framework will also be divided into three building classes, with a requirement to submit evidence case studies. These scopes will cover:

  • Domestic Low Rise
  • Domestic High Rise
  • Non-Domestic – commercial, education, and leisure

A Dynamic Purchasing System (DPS) will be created after the commencement of frameworks.

Jason Stapley, chief procurement officer at Pagabo, said: “There is a wide understanding of the need to design for net zero, but there is still a long way to go to meet government targets and improving our current building stock will play a key role in this.

“There are a lot of specialist organisations out there that are able to assist clients with their net-zero projects and strategies, and having these dedicated frameworks means that their services will be easier to access in a compliant manner for public sector organisations.”

It is expected that the invitation to tender will open in early September, ahead of the frameworks going live late January 2024.

Interested parties can register to join a pre-market engagement event on Thursday 10 August here 

Latest news

Driver escapes injury as scaffold collapses onto van

Major three-lift scaffold fall blocks north London high street
1 hour ago

Gilbert Ash to be sold to staff

£267m turnover contractor to transition to an Employee Ownership Trust
16 hours ago

M Group seals biggest-ever deal with Telent takeover

Digital infrastructure specialist deal lifts turnover to £3bn
7 hours ago

Aggregates firm Ashville went down owing more than £3m

Debts revealed in Companies House update
55 minutes ago

Cardo saves 100 jobs at Breyer roofing arm

Private equity-backed Welsh maintenance group continues to expand
18 hours ago

Excavator knocked off lorry going under bridge

Traffic Commissioner inquiry after accident in south London
2 hours ago

Czech energy tycoon buys UK’s biggest rebar supplier

Spanish offload Celsa UK operation to be rebranded 7 Steel UK
1 day ago

Caddick Construction targets £400m turnover

Regional shake-up pays off at contracting arm
2 days ago

Redrow chief steps down after Barratt merger

Matthew Pratt leaving after 22 years
2 days ago

United Living names new property services senior team

New CEO and COO appointed to lead growth in housing upkeep and retrofit
24 hours ago

Wynne triples turnover in three years to over £90m

Five-year growth strategy pays off
1 day ago

Speedy Hire blames Budget for branch closures

National Insurance rises accelerate closure programme
1 day ago

Builder gets suspended sentence for Covid loan fraud

M&E specialist inflated turnover to claim maximum loan
1 day ago

Scores of M&E firms win places on £400m CHIC framework

Axis Europe and Seddon secured spots on social housing deal
2 days ago

Coroner hears how worker was crushed under digger

Inquest opens into tragedy at Rose Builders site
2 days ago

Billington lowers 2025 forecast amid pricing pressure

Tender prices under pressure due to project delays and cancellations
2 days ago

Willmott Dixon lands Dover town centre revamp

Alliance agreed to regenerate several key council sites
3 days ago

Go-ahead for London City office-to-flats scheme

Hub's 150 Minories job in Aldgate to create 280 co-living homes
3 days ago

Wates mobilises as £200m Middlesbrough scheme approved

Gresham Street scheme includes a hotel, 240 flats and over 400 student rooms
3 days ago

Crashed M&E contractor TNA owed supply chain £7m

Sister company buys assets including company vans
3 days ago

Renaker eyes bumper 2025 despite Gateway 2 concern

Strong construction pipeline to support another record year
3 days ago

Wessex Water picks civils firms for £65m framework

Over 40 smaller firms will support AMP8 civils spending programme
3 days ago

Green light for nearly 400 flats at Leeds scheme

Three blocks up to 18 storeys approved at Armley Road
3 days ago

Subcontractors wanted across South London

Work up for grabs from main contractors and clients: Register now for Constructionline event
3 days ago

Heavy lorry ban on Severn Bridge as cables deteriorate

Crossing "not designed and built for today’s levels or weight of traffic"
3 days ago

Muse submits Oldham town centre regeneration plan

Plan advances for six sites to deliver 2000 homes, an hotel and office space
6 days ago

Construction returns to growth after two tough months

Concern grows Trump turmoil is spooking property investors
6 days ago

Skanska wins £43m Clifton Bridge deal

Contractors says scheme is a "complex project that will be delivered to tight timescales"
6 days ago

Green light for 44-storey Manchester resi tower

Developer Glenbrook to start hunt for main contractor
7 days ago

Ten win £670m Network Rail eastern region small works deal

CK Rail, QTS, Colt and Construction Marine pick up two lots
7 days ago

Contractor services