2,100 homes plan for UK’s largest cluster of Victorian gasholders

Aaron Morby 11 months ago
Share

Developer Berkeley Group’s St William division has submitted plans to restore the UK’s largest surviving cluster of Victorian gas holders to create 2,100 new homes within the heritage site.

The Bromley by Bow Gasworks site in east London comprises seven disused Grade II listed gasholders.

Seven gasholder frames will contain 10-storey blocks with six extra 15-20 storeys cylindrical buildings surrounding

Under plans drawn up by architect RSHP, these will be restored to incorporate many of the new homes within the cast iron structures.

The remaining homes will be built in higher rise surrounding cylindrical buildings echoing the gas holder homes.

St William’s ambitious scheme will involve a hefty upfront investment with the cost of temporary disassembly and restoration of the seven listed gasholders put at £80m alone.

The site is home to 7 of the last 19 listed gasholder remaining in the UK

This is before largely unquantifiable decontamination, enabling and ground remediation costs on the 9 hectare site.

Structural steel engineering specialists Craddys and Shepley have been closely involved in drawing up plans to reuse the cast iron gas holder structures, built between 1870 and 1882 for a cost of £300,000.

Both firms were previously involved in the project to dismantle, refurbish and re-erect the Gasholder No.8 guide frame at Kings Cross as well as the refurbishment and re-erection of the Kings Cross Triplets Gasholders.

St William has submitted a hybrid planning application for the site, which also include the remains of two gas holders destroyed by the Luftwaffe in the second World War.

New lake at centre of the site where gasholder once stood before being destroyed

These will turned into a central circular lake and a community space covered with one of the gas holder iron frames.

Planned community area framed with iron frame from one of the old gasholder tanks

Detailed consent application

Phase 1 to deliver 634 homes  – Plan for two new buildings in existing gasholders – G1 and G2 – rising to 7 and 10 storeys and two new ‘pencil buildings’  rising to 15 and 20 storeys

Also includes 1,700sq m of flexible commercial / non-residential

Outline consent application

All other gasholder buildings – G3, G4, G5, G6, G7, G8 and G9 and Pencil Buildings B1, B2, B3 and B4 – to deliver nearly 1,500 homes.

Includes new community facilities, some retail and commercial floorspace including office and light industrial uses and entertainment revenues

Full scheme plan alongside neighbouring TwelveTrees Park scheme also being delivered by Berkeley Homes

Latest news

McAlpine healthcare MD joins BAM as Northern chief

Mark Gibson joins as Northern regional director
2 days ago

HS2 Align JV completes Britain’s longest rail bridge – video

Final deck segment sees HS2 viaduct break 137-year old record held by Tay Bridge
2 days ago

Green light for major London city fringe office retrofit

Overhaul of 30 Finsbury Square to start next Summer
2 days ago

John Lewis submits plan for £80m Reading rental flats scheme

Construction hoped to start on 215 flats scheme at the start of 2026
2 days ago

Balfour Beatty lands £27m Highlands flood defence scheme

Work to start imminently building river walls in Comrie
2 days ago

Buyers believe construction has “turned a corner”

Residential rebounds, commercial still strong but civils slows
3 days ago

Vistry unseats Barratt as Britain’s biggest house builder

Partnership homes specialist on track to build 18,000 homes this year
3 days ago

23 jobs axed as Lincolnshire contractor goes under

C G Godfrey provided civils and M&E services in Eastern England
3 days ago

Winvic first to use remote-control tower crane on site

Crane driver sits in ground floor command centre at Birmingham 33-storey tower
3 days ago

Starmer vows to ban Grenfell firms from public contracts

Prime Minister to write to named and shamed construction firms
3 days ago

Grenfell Inquiry calls for uber construction regulator

Shake-up must include licensing of main contractors taking on high rise projects
4 days ago

Robertson to restore historic Newcastle market

Work to revamp Grainger Market to start by the end of this month
3 days ago

Three bidders chase £1.4bn Midlands rail hub alliance

Balfour, Skanska, Bam and Laing O'Rouke in bidding for eight-year rail upgrade
4 days ago

Barratt profit nosedives as margin slumps to 4.2%

Fire safety provisions jump by an extra £126m to total £628m
4 days ago

First viaduct completed on HS2: Video site report

Eiffage, Kier, Ferrovial Construction and Bam Nuttall finish 163m long Highfurlong Brook Viaduct
4 days ago

Bouygues bags £28m Oxfordshire school job

St John’s Academy to be at heart of Wellington Gate Development
4 days ago

Willmott Dixon wins £49m Wigan college expansion

New campus for Wigan & Leigh College to be net zero in operation
4 days ago

Work to start on Liverpool office to flats job

Truman D&B wins resi conversion in Moorfields district
4 days ago

Government mothballs plan to scrap CE Mark

Building safety minister warns there is insufficient capacity in present testing regime
5 days ago

Government backs record number of clean energy projects

131 projects will produce electricity to power 11 million homes.
5 days ago

Tube station housing plan gets Government green light

Plans to transform Cockfosters Tube station were blocked by previous regime
5 days ago

Go-ahead for Bristol Temple Quay hotel and build to rent job

A trio of blocks will house a 230-room hotel, 170-room apart-hotel and 100 rental flats
5 days ago

Construction costs cut for Plymouth city centre revamp

Price of Armada Way scheme falls to £30m after exploratory work on site
5 days ago

Tilbury Douglas chief Paul Gandy to step down

Craig Tatton to take on CEO role from November
6 days ago

Local pressure unblocks £240m Oxford sewage works upgrade

Council warns Thames Water delay is halting building of thousands of new homes
6 days ago

Knights Brown bags last phase of £86m Portsmouth flood defence job

Contractor has already completed second and third phases of North Portsea Coastal Scheme
6 days ago

Bidding starts for £1bn housing decarbonising framework

National housing energy efficiency retrofit deal will come into force in 2015
6 days ago

World’s strongest land-based crane launched

Mammoet crane will help build major energy and infrastructure projects
6 days ago

Big Yellow gets go-ahead for largest London site

Storage giant to build 176,000 sq ft scheme next to Kensington Olympia
6 days ago

Worker dies after being buried by trench collapse

Court hears workers on new build housing site had no training on working within excavations
6 days ago

Contractor services