‘Retrofit first’ policy floated for City of London schemes

Aaron Morby 12 months ago
Share

Planners at the City of London Corporation have set out proposals to force developers to seriously consider retrofit and reuse as first options for planned redevelopment of buildings in the Square Mile.

Proposed new planning guidance will reshape future developments
Proposed new planning guidance will reshape future developments

The new Sustainability Supplementary Planning Document also sets out forceful guidance on controlling carbon emissions, flexible building design and further greening schemes as part of the Corporation’s net zero plan for the whole Square Mile by 2040.

The proposed guidance now out to consultation sets out what the City Corporation expects to see addressed in developer’s approach to their sites and the design and construction of buildings.

Five key considerations are identified in the guidance for developers


  • Retrofit and reuse – ‘retrofit first’ approach, promoting the reuse of existing buildings where this is the most sustainable and suitable approach for a site, in line with the City Corporation’s adopted Carbon Options Guidance.
  • Energy use and ‘Whole Life-Cycle’ carbon emissions – Focus on reducing and mitigating emissions from construction and the use of a building over its entire life, including demolition and disposal.
  • Circular economy in construction and operation – Developers should shift from a linear to a more circular construction model, where a long-life, loose-fit, low-energy approach is taken to all new and existing buildings and materials.
  • Climate resilience – Sets out how flood risk management, sustainable drainage systems, water management, infrastructure resilience, disease and pest control, as well as urban heating, should be approached for developments within the City.
  • Biodiversity and urban greening – Providing guidance on how development should contribute to connecting green spaces, creating more greening in the City, and provide measures that improve the biodiversity of the Square Mile.

Chairman of the Corporation’s Planning and Transport Committee, Shravan Joshi, said: “The Committee’s approval of this Sustainability SPD is a giant step forward for the City Corporation in pursuit of its decarbonisation goals, particularly as the built environment sector contributes around 40% of the City’s total carbon emissions.

“The City of London is home to some of the most sustainable buildings on the planet and as it continues to be a hugely attractive place for office occupiers, we are confident that investors and developers will continue with us on the path to a sustainable Square Mile.”

The first draft of the SPD will be out for public consultation in Spring 2024.

It has been designed to align to align with the emerging City Plan 2040, expected to be approved and adopted in 2024.

 

Latest news

Winners revealed for £5.4bn electricity grid upgrade

SP Energy Networks unveils 19 winners - full list
18 hours ago

Malaysian property giant to buy 50% stake in JRL

IJM Land to buy into diversified £800m turnover south east contractor
24 hours ago

Fast-track skills hubs to train 5,000 extra apprentices

Plan for network of 32 skills hubs to rain construction apprentices in half the time
17 hours ago

Luxury house builder files administration notice

£31m turnover Octagon Developments Ltd lodges court notice
1 day ago

Morgan Sindall takes on £22m stalled ISG Cardiff school job

Workplan is being drawn up ahead of restart on Penarth school
1 day ago

Walker Modular wins bathroom pod deal on student tower

Sealant-free construction method helps supplier dominate student market
1 day ago

Over £600m awarded for decarbonisation projects – full lists

Over 240 public building energy upgrade projects secure cash
2 days ago

Enabling works to start on £130m Huyton town centre regen

Phase one includes a new council HQ, hotel and 72 flats
2 days ago

Ridge buys rival consultant Jubb

Acquisition will see 100 new staff join Ridge
2 days ago

Grainger build to rent pipeline rises to £1.4bn

Rental specialist buys sites in Sheffield and Cardiff to build 600 rental homes
2 days ago

Kier wins Cambridgeshire County council estate upkeep

Firm will provide building and M&E services to 106 buildings across the county
2 days ago

Louvres and solar shading specialist files for administration

Hampshire based ALPS lodges court notice after 25 years in business
2 days ago

Speedy Hire posts a loss in latest results

Hire giant confident of better performance in next six months
2 days ago

Esh to lead next phase of Riverside Sunderland regeneration

Infrastructure work will allow further development of Sheepfolds area
2 days ago

Green light for £1.3bn Edinburgh coastal town revamp

First phase of Granton Waterfront scheme will see Cruden Homes create a new community
3 days ago

Vistry chief operating officer steps down

Earl Sibley exits as his COO role axed for more direct reporting to CEO
3 days ago

House builder Camstead goes into administration

Work stopped on three current sites
4 days ago

Death of piling legend Roger Bullivant

Industry innovator dies after long illness aged 85
3 days ago

ESS Modular went down owing suppliers £7m

Modular specialist owned by ISG owner Cathexis
3 days ago

Builders back farmers in inheritance tax protest

"A rethink is desperately needed" say National Federation of Builders
3 days ago

Willmott Dixon wins £36m leisure centre upgrade

Work to start on historic Westminster 1930s Grade II listed Seymour Centre
3 days ago

Graham wins £100m Cardiff Crossrail phase 1

Work on route to Cardiff Bay to start before end of next year
4 days ago

Laing O’Rourke appoints new European MD

Peter Lyons to take-up new role in February
5 days ago

Profits dip at Stepnell ahead of demerger

Turnover and secured workloads up ahead of restructure
5 days ago

HS2 green bridge deck takes shape

100m-wide wildlife bridge to carry hedgerows and country lane over HS2
4 days ago

1,000-home Wolverhampton city centre scheme in for planning

ECF and council advance City Centre West build to rent scheme
5 days ago

Sisk clinches £54m North London council HQ revamp

Haringey's iconic Grade II listed civic centre to be brought back into use
5 days ago

Ofgem approves £2.5bn Eastern Green Link 1

Work to start next Spring on cable project from Scotland to the north of England
5 days ago

Anglian Water hunts for £1bn delivery partner

Programme delivery partner wil integrate with client team over 15-year plan
5 days ago

Hadden collapse costs supply chain £6.7m

"Highly unlikely" subcontractors will receive anything for their unpaid invoices
5 days ago

Contractor services