Construction Manager of the Year crowned

Grant Prior 1 year ago
Share

Galliford Try’s Barry Kingscote has been crowned Construction Manager of the Year for his work on a tricky demolition and reconstruction job at Marble Arch in central London.

Barry Kingscote and CIOB President, Sandi Rhys Jones
Barry Kingscote and CIOB President, Sandi Rhys Jones

He fended off competition from more than 85 finalists across 13 different categories to claim the top prize following his project to develop a unique office space (see project details below).

Kingscote described the project as the most complex of his construction career which spans more than 40 years.

He said: “I can’t put the feeling into words.

“To go against all these fantastic managers in so many fields and to come out on top is just so surprising. It’s an honour and I would like to congratulate everyone who has been recognised.”

Kingscote was awarded the accolade at the annual Chartered Institute of Building (CIOB) Awards on Tuesday night.

Other winners on the night included:

  • Construction Manager, High Rise Accommodation – Chris Warren, Willmott Dixon
  • Construction Manager, Low Rise Accommodation – Andrew Deacon, Linear Design & Construct
  • Construction Manager, Education – Jeremy Eavis FCIOB, Mace
  • Construction Manager, Public – Danial Moore MCIOB, Willmott Dixon
  • Construction Manager, Leisure and Healthcare – Ross Taylor MCIOB, Willmott Dixon
  • Construction Manager, Commercial – Barry Kingscote, Galliford Try
  • Construction Manager, Restoration – Jonathan Brock
  • Team Award – Barr Build, Ridgeley Farmhouse Team
  • Client Award – Ministry of Justice
  • Equality Diversity and Inclusion Team Award – BBVS
  • Sustainability Award – Saul Humphrey, Saul D Humphrey LLP (and Anglia Ruskin University)

Caroline Gumble, chief executive officer at CIOB, said: “It was a wonderful evening, an inspiring and much-needed celebration of our sector. There is no doubt that there’s a real depth of talent among the UK’s built environment professionals, with some incredibly impressive projects making the list of finalists.

“It was great to see the awards go to a range of individuals and companies, all of whom are amazing examples of leadership and dedication, all delivering a high-quality built environment. Many congratulations to all our winners.”

Barry Kingscote’s winning project

Demolition and reconstruction of eight-storey building with retained facade, completed in 192 weeks.

Kingscote’s calmness, professionalism and enthusiasm for problem-solving drove success on a scheme that had trouble written all over it, with busy roads on the site perimeter, multiple party walls, a retained facade, and construction of a large second-level basement.

By challenging the design and championing cost- and programme-efficient solutions, Kingscote delivered value and innovation. He introduced a reinforced concrete core in place of steel, and blockwork in place of precast panels. Crucially, he formed the second level of the basement with secant piling rather than sheet, which reduced vibration and noise as well as complexity and cost by allowing part of the building load to be transferred through the new secant wall.

Equally transformational was Kingscote’s use of pile caps between the existing foundations for the facade retention structure. It allowed a slenderer pile design, and easier integration and coordination with the new structural steel frame. And once the frame was permanently connected to the facade, he added an array of 50 steel ‘needles’ to the retention structure to support four storeys of the facade while the shopfront was rebuilt.

Having essentially won this contract through the success of a previous £51m project for a customer that had never before operated as a lone client, Kingscote delivered another tour de force. Once again, the contractor has won repeat business – the fit-out on this project – largely in recognition of the added value he brought.

 

Latest news

Comment: Gateway is acting like a barricade

Contractors left banging their heads on an (unbuilt) brick wall
1 day ago

Final phase of £1.5bn Elephant and Castle revamp hits planning

Get Living submits revised plan for 500 homes and 450-bed student block
2 days ago

Ealing backs final phase of £1.3bn estate rebuild

Friary Park estate rebuild in Acton reaches end stage
1 day ago

Green light for scaled-down Nottingham student tower

Glasshouse Street scheme will deliver 247 student rooms
1 day ago

Aston Villa to revamp North Stand

Club to reuse existing structure rather than complete rebuild
2 days ago

Mace signs ex-ISG director to lead Euro health and tech push

Gary Sweeney to head up healthcare and life sciences consultancy arm
1 day ago

Sir Robert McAlpine claws way back into profit

Firm says return to profit and strong cash balance validates new strategy
2 days ago

Severfield to cut staff by 6% amid pricing pressure

Steelwork contractor warns of extended tighter pricing due to project delays
2 days ago

JRL completes sale of 50% stake to Malaysian giant IJM

Deal boosts balance sheet and kicks starts growth plan
2 days ago

Green light for £100m Liverpool Baltic station build

Enabling highway works to start in the autumn
3 days ago

First live tests for flying construction robots

Drones can lay construction materials at height on site
2 days ago

Three firms land £170m Gentoo Sunderland housing deal

PHS Solutions, Esh and RE:GEN to deliver 10-year home upgrade plan
3 days ago

Gateway gridlock hits build-to-rent delivery as starts nosedive

Build to rent starts plunge 18% in the capital
3 days ago

Call to shift Gateway 2 checks to end building bottleneck

"The current system isn't working but we all want to see safe buildings"
3 days ago

GBN launches £600m bid race for SMR engineer roles

Owner engineers to provide technical and assurance services
3 days ago

Wates hires ex-Homes England chief to head public sector push

Robert Stone to spearhead its public sector and national frameworks strategy
3 days ago

Acheson Construction collapse costs suppliers £8.5m

One frustrated creditor seized a telehandler after contractor went into administration
4 days ago

Dominus wins go-ahead for 173-bed Glasgow scheme

Old Wynd Street job expected to cost around £25m to build
4 days ago

Safety Regulator misses deadline to clear Gateway 2 backlog

Investors pulling out of funding high rise buildings
4 days ago

CITB still sitting on £95m cash pile

Staff numbers jump from 666 to 763 as training body wage bill soars
4 days ago

£500m road surfacing framework market call

NEPO goes out to consultation on north east regional highways deal
4 days ago

Two share £220m Scottish rail repairs and minor works deal

AmcoGiffen and CPMS win civils and building repair deals
4 days ago

Builder wanted for £60m London leisure and flats job

Tower Hamlets aims to replace St George’s Leisure Centre in Shadwell
4 days ago

Contractor confirmed for business park expansion

Roe Developments to start on next phase of Castle Donington scheme
4 days ago

Driver escapes injury as scaffold collapses onto van

Major three-lift scaffold fall blocks north London high street
1 week ago

Gilbert Ash to be sold to staff

£267m turnover contractor to transition to an Employee Ownership Trust
1 week ago

M Group seals biggest-ever deal with Telent takeover

Digital infrastructure specialist deal lifts turnover to £3bn
1 week ago

Aggregates firm Ashville went down owing more than £3m

Debts revealed in Companies House update
1 week ago

Cardo saves 100 jobs at Breyer roofing arm

Private equity-backed Welsh maintenance group continues to expand
1 week ago

Excavator knocked off lorry going under bridge

Traffic Commissioner inquiry after accident in south London
1 week ago

Contractor services