Timber roof dropped in flagship HS2 station design rethink

Aaron Morby 2 days ago
Share

HS2 Curzon Street station contractor Mace Dragados JV has redesigned the station dropping a striking internal timber roof design for aluminium panels.

The elegant sleek low arch design is retained but fire safety concerns and more cost-effective maintenance has seen copper-coloured aluminium replace the timber first conceived by lead architect Grimshaw.

MD joint venture, working with their design partners Arcadis and WSP along with Grimshaw, have now revealed the proposed design refinements, that will be submitted for approval to Birmingham City Council later this year.

HS2 said: “Further development of the materials being used will also improve construction efficiency, future-proof the station and minimise maintenance requirements over its 120-year life span.”

New interior showing profiled aluminium panels

Under the detailed plans, the station will be fitted with additional cycle parking, better accessibility, more seating spaces and simplified access between platforms.

Improvements to the station’s arrival areas include a redesign of the southern entrance of the Eastern Concourse to make it more prominent, strengthening the arrival experience and providing better links with Digbeth.

Major earthworks have already started on the construction site, preparing for foundation work to get underway this Autumn and building work on the main station structure to start next year.

The internal fit-out of the station will start towards the end of 2025 and finish at the end of 2028.

Grimshaw Partner Neven Sidor, in charge of the architectural design said: “Any design for a major and complex public building needs to negotiate a journey from preliminary concept in the minds of a team of engineers and architects to a much more detailed set of technical drawings embraced by the teams of contractors that will build it.

“We are therefore pleased to announce that the original design vision has not only been maintained but has also been enhanced through the detailed design process. It is more robust, more efficient to build, and just as elegant.”

 

Latest news

Top consultant tells clients stop using fixed-price contracts

Contractors' selective tendering policies force clients to rethink risk transfer
9 hours ago

Winners named for £1bn Yorkshire storm overflow alliance

AtkinsRéalis, Morrison Water Services, Stantec, and Ward & Burke bag places
1 day ago

Temporary works specialist trebles size with takeover

Independent Design House Group acquires Clarkebond
2 hours ago

“Olympic” medals to crackdown on late payers

Gold, silver and bronze awards for payment speed and fines for non-compliant directors and firms
8 hours ago

Morgan Sindall clinches £60m Cardiff school job

Work to start in November on new 900-pupil Willows High School
8 hours ago

Pensioner dies after fall through hole left by contractor

Builder fined £150,000 after accident during bathroom renovation
9 hours ago

Careys launches skills bootcamp for groundworkers

Training centre opens at contractor's former Wembley head office
9 hours ago

Cala Group sold for £1.35bn

Investment groups including former owner sign deal
1 day ago

Balfour Beatty fined £285,000 after scissor lift death

Court hears how crane pushed over platform killing one worker and seriously injuring another
2 days ago

House builders fail to get seat on New Towns Taskforce

Policy and planning experts dominate Rayner New Towns Taskforce
1 day ago

Timber roof dropped in flagship HS2 station design rethink

New Curzon Street aluminium panel design offers better fire safety and cheaper upkeep
2 days ago

Plan in for 4,000 homes at Earls Court in London

£10bn scheme advances for London's largest development site
2 days ago

Former MD returns to head O’Keefe Construction

Lee Horsley returns to civils specialist to replace Marc Daly
1 day ago

Luton Town put in plans for new stadium

Construction to be completed by 2027 on new home for football club
2 days ago

Henry Boot looking to new boss to boost construction

Construction turnover down as division behind schedule winning work
2 days ago

Billington to expand Shafton works as order book swells

Low steel prices tempt clients to bring stalled projects to the market
2 days ago

Network Plus Services doubles profit to £32m

Turnover at private equity-backed business tops £500m
2 days ago

Coroner in training call after scissor-lift tragedy

Practical rescue training needed after worker crushed to death
3 days ago

Deal to re-start £37m Burnley flood defence job

VolkerStevin/Jacobs' Padiham scheme stalled when costs doubled
2 days ago

Big public procurement shake-up put back to February

Government delays Procurement Act go-live date by four months
2 days ago

Architecture boss joins Caddick as Design Director

Former DLA Architecture director Jason Clarke to boost contractor's design offering
3 days ago

Vinci Building and FM arms rack up big losses for second year

Inaugural consolidated accounts for all Vinci UK operations slip into the red
3 days ago

Plan lodged for two Birmingham student towers

Sama plans nearly 2,000 student rooms in 48 and 41 floor buildings at Lancaster Circus
3 days ago

Galliford Try delays annual results announcement

Accountants want more time to go through books
3 days ago

CITB urged to give everyone a say over need for levy

Consensus process slammed as a "charade"
3 days ago

Subcontractors wanted across north London

Constructionline event to highlight work opportunities: Register now
3 days ago

Latest construction hotspots appear outside London

Research reveals fastest growing areas for contract awards
3 days ago

Bachy Soletanche rejigs business in new growth plan

Business split into two regional and a major projects division
3 days ago

BAM, Arup and Amey win £2bn Network Rail contract

Largest single contract by value ever awarded by Network Rail.
6 days ago

Luton airport £2.4bn expansion decision delayed

Application decision deadline pushed back 3 months to January 2025.
6 days ago

Contractor services