Caddick kicks off Digbeth regen plan with £43m flats job

Aaron Morby 3 months ago
Share

Caddick has secured the first phase of developer Cole Waterhouse’s £260m regeneration project in Digbeth.

The 180,000 sq ft residential project kicks off a wider regeneration of Upper Trinity Street and will comprise 211 flats delivered in three blocks, the tallest of which is 10 storeys high.

Construction will commence imminently following demolition and enabling works.

The scheme’s Pump House Park is designed around the historic lock keepers cottage which is to be retained and renovated

Designed by Corstorphine & Wright, the full Cole Waterhouse UTS scheme will deliver a mix of rentable and open market sales homes, some with live-work space, a 133-bedroom hotel, 60,000 sq ft of commercial space, car parking and large new areas of public realm.

Planned Upper Trinity Street regeneration scheme in Digbeth

The development of around eight buildings, one rising to up to 31-storeys is expected to create 600 jobs during the construction phase.

Ray O’Sullivan, Regional Managing Director for Caddick Construction Midlands, said: “Cole Waterhouse has visualised an ambitious and impressive masterplan to create a thriving creative and cultural hub at Upper Trinity Street, and we’re proud to have been appointed to bring this vision to life in phase one.

“Caddick has built its extensive expertise delivering high-quality residential projects across the North, and as we take on new and exciting projects in the Midlands.”

The project marks Caddick’s second major regeneration development in the Midlands, adding to the nearby Port Loop scheme, which has seen Caddick build 58 new-build apartments on behalf of Urban Splash and Places for People.

 

Latest news

Comment: Gateway is acting like a barricade

Contractors left banging their heads on an (unbuilt) brick wall
2 days ago

Final phase of £1.5bn Elephant and Castle revamp hits planning

Get Living submits revised plan for 500 homes and 450-bed student block
3 days ago

Ealing backs final phase of £1.3bn estate rebuild

Friary Park estate rebuild in Acton reaches end stage
2 days ago

Green light for scaled-down Nottingham student tower

Glasshouse Street scheme will deliver 247 student rooms
2 days ago

Aston Villa to revamp North Stand

Club to reuse existing structure rather than complete rebuild
3 days ago

Mace signs ex-ISG director to lead Euro health and tech push

Gary Sweeney to head up healthcare and life sciences consultancy arm
2 days ago

Sir Robert McAlpine claws way back into profit

Firm says return to profit and strong cash balance validates new strategy
3 days ago

Severfield to cut staff by 6% amid pricing pressure

Steelwork contractor warns of extended tighter pricing due to project delays
3 days ago

JRL completes sale of 50% stake to Malaysian giant IJM

Deal boosts balance sheet and kicks starts growth plan
3 days ago

Green light for £100m Liverpool Baltic station build

Enabling highway works to start in the autumn
4 days ago

First live tests for flying construction robots

Drones can lay construction materials at height on site
3 days ago

Three firms land £170m Gentoo Sunderland housing deal

PHS Solutions, Esh and RE:GEN to deliver 10-year home upgrade plan
4 days ago

Gateway gridlock hits build-to-rent delivery as starts nosedive

Build to rent starts plunge 18% in the capital
4 days ago

Call to shift Gateway 2 checks to end building bottleneck

"The current system isn't working but we all want to see safe buildings"
4 days ago

GBN launches £600m bid race for SMR engineer roles

Owner engineers to provide technical and assurance services
4 days ago

Wates hires ex-Homes England chief to head public sector push

Robert Stone to spearhead its public sector and national frameworks strategy
4 days ago

Acheson Construction collapse costs suppliers £8.5m

One frustrated creditor seized a telehandler after contractor went into administration
5 days ago

Dominus wins go-ahead for 173-bed Glasgow scheme

Old Wynd Street job expected to cost around £25m to build
5 days ago

Safety Regulator misses deadline to clear Gateway 2 backlog

Investors pulling out of funding high rise buildings
5 days ago

CITB still sitting on £95m cash pile

Staff numbers jump from 666 to 763 as training body wage bill soars
5 days ago

£500m road surfacing framework market call

NEPO goes out to consultation on north east regional highways deal
5 days ago

Two share £220m Scottish rail repairs and minor works deal

AmcoGiffen and CPMS win civils and building repair deals
5 days ago

Builder wanted for £60m London leisure and flats job

Tower Hamlets aims to replace St George’s Leisure Centre in Shadwell
5 days ago

Contractor confirmed for business park expansion

Roe Developments to start on next phase of Castle Donington scheme
5 days ago

Driver escapes injury as scaffold collapses onto van

Major three-lift scaffold fall blocks north London high street
1 week ago

Gilbert Ash to be sold to staff

£267m turnover contractor to transition to an Employee Ownership Trust
2 weeks ago

M Group seals biggest-ever deal with Telent takeover

Digital infrastructure specialist deal lifts turnover to £3bn
2 weeks ago

Aggregates firm Ashville went down owing more than £3m

Debts revealed in Companies House update
1 week ago

Cardo saves 100 jobs at Breyer roofing arm

Private equity-backed Welsh maintenance group continues to expand
2 weeks ago

Excavator knocked off lorry going under bridge

Traffic Commissioner inquiry after accident in south London
1 week ago

Contractor services