Heavy lorry ban on Severn Bridge as cables deteriorate

Grant Prior 4 days ago
Share

Heavy goods vehicles over 7.5 tonnes will be banned from using the Severn crossing from next month after safety inspections showed deterioration to the supporting cables

In 2022/23, an assessment of the bridge’s main cables was carried out, followed by further laboratory testing, revealing that the main cables are deteriorating and not as strong
In 2022/23, an assessment of the bridge’s main cables was carried out, followed by further laboratory testing, revealing that the main cables are deteriorating and not as strong

From Tuesday 27 May two lanes on the M48 bridge will remain open to all other vehicles to ensure the safety of the bridge and reduce the load on the cables.

The weight restriction will need to remain in place for an estimated 12 to 18 months, dependent on further investigations and whilst National Highways develops and installs a medium-term solution to ensure vehicle loads remain within safe limits.

Chris Pope, Programme Delivery Manager for National Highways, said: “Safety is our number one priority, and this weight restriction is about future-proofing the bridge for years to come.

“Whist the bridge remains safe, it was not designed and built for today’s levels or weight of traffic. Vehicles have got heavier and traffic levels have increased significantly over the last 60 years putting greater load on the cables.

“As with all our structures, we will continue to monitor the bridge and ensure it remains safe for users.”

The M48 Severn Bridge carried roughly 32,000 vehicles a day in 2024, 3,270 of which were heavy goods vehicles over 7.5t, meaning around 10 percent of traffic will be diverted via the M4 Prince of Wales Bridge once the restrictions are in place.

Since the bridge opened nearly 60 years ago, the size and weight of HGVs have increased significantly due to evolving transport demands, some rising from 22 tonnes to 44 tonnes.

Traffic numbers have also increased over the decades. Since the tolls were removed on the bridge in 2018 there has been a 34% increase in traffic and these changes mean a substantial increase in weight over the bridge, which it was not designed for.

The M48 Severn Bridge has undergone several major assessments and interventions related to its main suspension cables due to concerns about corrosion and strength reduction, caused by its exposure to harsh weather conditions.

In 2022/23, an assessment of the bridge’s main cables was carried out followed by further laboratory testing.

Finalised in December 2024, the results revealed that the main cables are deteriorating and not as strong. Due to these results, it was recommended National Highways reduce the load on the bridge to minimise further damage.

Latest news

Driver escapes injury as scaffold collapses onto van

Major three-lift scaffold fall blocks north London high street
2 days ago

Gilbert Ash to be sold to staff

£267m turnover contractor to transition to an Employee Ownership Trust
2 days ago

M Group seals biggest-ever deal with Telent takeover

Digital infrastructure specialist deal lifts turnover to £3bn
2 days ago

Aggregates firm Ashville went down owing more than £3m

Debts revealed in Companies House update
1 day ago

Cardo saves 100 jobs at Breyer roofing arm

Private equity-backed Welsh maintenance group continues to expand
2 days ago

Excavator knocked off lorry going under bridge

Traffic Commissioner inquiry after accident in south London
2 days ago

Czech energy tycoon buys UK’s biggest rebar supplier

Spanish offload Celsa UK operation to be rebranded 7 Steel UK
3 days ago

Caddick Construction targets £400m turnover

Regional shake-up pays off at contracting arm
3 days ago

Redrow chief steps down after Barratt merger

Matthew Pratt leaving after 22 years
3 days ago

United Living names new property services senior team

New CEO and COO appointed to lead growth in housing upkeep and retrofit
2 days ago

Wynne triples turnover in three years to over £90m

Five-year growth strategy pays off
2 days ago

Speedy Hire blames Budget for branch closures

National Insurance rises accelerate closure programme
2 days ago

Builder gets suspended sentence for Covid loan fraud

M&E specialist inflated turnover to claim maximum loan
3 days ago

Scores of M&E firms win places on £400m CHIC framework

Axis Europe and Seddon secured spots on social housing deal
4 days ago

Coroner hears how worker was crushed under digger

Inquest opens into tragedy at Rose Builders site
4 days ago

Billington lowers 2025 forecast amid pricing pressure

Tender prices under pressure due to project delays and cancellations
3 days ago

Willmott Dixon lands Dover town centre revamp

Alliance agreed to regenerate several key council sites
4 days ago

Go-ahead for London City office-to-flats scheme

Hub's 150 Minories job in Aldgate to create 280 co-living homes
4 days ago

Wates mobilises as £200m Middlesbrough scheme approved

Gresham Street scheme includes a hotel, 240 flats and over 400 student rooms
4 days ago

Crashed M&E contractor TNA owed supply chain £7m

Sister company buys assets including company vans
4 days ago

Renaker eyes bumper 2025 despite Gateway 2 concern

Strong construction pipeline to support another record year
4 days ago

Wessex Water picks civils firms for £65m framework

Over 40 smaller firms will support AMP8 civils spending programme
4 days ago

Green light for nearly 400 flats at Leeds scheme

Three blocks up to 18 storeys approved at Armley Road
4 days ago

Subcontractors wanted across South London

Work up for grabs from main contractors and clients: Register now for Constructionline event
4 days ago

Heavy lorry ban on Severn Bridge as cables deteriorate

Crossing "not designed and built for today’s levels or weight of traffic"
4 days ago

Muse submits Oldham town centre regeneration plan

Plan advances for six sites to deliver 2000 homes, an hotel and office space
1 week ago

Construction returns to growth after two tough months

Concern grows Trump turmoil is spooking property investors
1 week ago

Skanska wins £43m Clifton Bridge deal

Contractors says scheme is a "complex project that will be delivered to tight timescales"
1 week ago

Green light for 44-storey Manchester resi tower

Developer Glenbrook to start hunt for main contractor
1 week ago

Ten win £670m Network Rail eastern region small works deal

CK Rail, QTS, Colt and Construction Marine pick up two lots
1 week ago

Contractor services