Refurb foreman kept in dark over asbestos threat

Grant Prior 11 years ago
Share

A Battersea contractor has been fined for failing to highlight the known presence of asbestos insulating board (AIB) at a Berkshire warehouse.

The move exposed a foreman and others to potential harm when it was ripped out during refurbishment work.

Redwood Contractors Ltd was in possession of a detailed asbestos survey that clearly identified the location of the asbestos wall panels inside the building in Wokingham.

But the survey wasn’t shared with the team on the ground.

So when a foreman mistook the AIB for asbestos cement – a lower risk material – it was removed without adequate control measures and protective equipment.

Reading Magistrates’ Court heard that AIB should only be removed by a licensed asbestos contractor because of the risk of exposure to the dangerous fibres contained within it.

HSE established that the site foreman wasn’t provided with any documentation or other information about the panels.

This was despite an asbestos survey being completed just two months prior to the work starting.

Because the foreman was unaware that the panels were made from AIB, the wrong kind of control measures were in place when he removed them.

He and others could therefore have unwittingly inhaled asbestos fibres, which can cause terminal health conditions.

Redwood Contractors Ltd, of London, SW11, was fined a total of £10,000 and ordered to pay £2,857 in costs after pleading guilty to two separate safety breaches.

After the hearing, HSE inspector Karen Morris commented: “It is disappointing that the foreman and others were needlessly put at risk simply because the asbestos survey for the warehouse wasn’t supplied to the team on the ground, or the location of the AIB relayed.

“What is the point of having a suitable survey in hand if you aren’t going to act on it and share vital information with those who need to know?

“Sadly, breakdowns in communication of this kind are all too common, but that doesn’t excuse Redwood Contractors from failing to do more.

“The company is guilty of a clear oversight that may have compromised the future health and wellbeing of its workers.

“Everyone knows that asbestos is a potential killer, and the onus is on duty holders to implement proper control measures at all times when dealing with asbestos.”

Latest news

Keltbray fine increased to £18m after failed bid rigging appeal

Contractor loses penalty discount for settling with competition authorities
14 hours ago

Luxury house builder goes under with 70 job losses

Octagon Developments in administration after 40 years in business
24 hours ago

Top Ten best read stories of 2024

The biggest headlines of an eventful year. Have a good one and here's to a successful 2025
1 day ago

BAM Nuttall fined £800,000 after concrete skip tragedy

Young labourer killed by falling bale arm
2 days ago

Keltbray infrastructure business reveals new name

AUREOS means "new dawn" after private equity acquisition
1 day ago

Stiffer fines for over-running street works from next Summer

Cash raised from lane rentals to be channeled into pothole repairs
1 day ago

£113m Basildon rental homes scheme seals build finance

Work expected to start early next year on Market Square project
1 day ago

Notting Hill Genesis seeks more tier 1 repairs contractors

London housing trust seeks eight firms for new £1.5bn repairs framework
1 day ago

Reclaimed steel oil rig columns worked into London office revamp

Curo will use reclaimed bricks and steel for Fitzrovia office overhaul
2 days ago

CITB delays levy approval consultation

Levy agreement talks pushed back by ongoing review into effectiveness of training body
2 days ago

Ofwat approves £104bn water industry spending plan

Household water bills to rise by 36% to fund quadrupling of investment
2 days ago

Costain/ Siemens JV clinches HS2 power supply job

£300m deal for HV power supply systems over the 225km route
2 days ago

Demolition team assembles on Multiplex London Wall site

Erith to start work next month at Deutsche Bank's former headquarters
3 days ago

Norwich Council acts to revive £300m Anglia Square scheme

Council uses Homes England funding to buy stalled site with planning for 1,100 homes
2 days ago

Go-ahead for 4,500-home Cambridgeshire new town

Waterbeach new town plan stalled three years ago after an Environment Agency objection
2 days ago

Henry Boot to take total control of Stonebridge Homes

Deal worth at least £30m
2 days ago

HS2 costs could hit £66bn

Government looking for next estimate to be lower
3 days ago

Mace to close construction logistics arm

Specialist business being wound down
3 days ago

National Grid to invest £35bn over next five years

Plan set out for record investment in electricity transmission infrastructure
3 days ago

Profits double at Barhale

Civils specialist sees order book top £1bn
3 days ago

Balfour wins 68km HV underground power cable deal

Main works to start next year on Eastern Green Link 2 job
3 days ago

Stunning site wrap unveiled on Sloane Street

Hoarding creates illusion of fully formed façade on £53m Galliford Try job
3 days ago

Heathrow Airport upgrade spend takes off again

Airport operator will spend £2.3bn over the next two years
3 days ago

Government buys back over 36,000 military homes

Public ownership deal to release wave of upgrade and new build work
4 days ago

Story Contracting staff braced for rail job losses

Work coming through slower than expected from Network Rail
4 days ago

Ballymore submits two plans for 3,700 East London homes

Construction could start in 2025 on Thames Road and Knights Road schemes
4 days ago

Blackpool council steps in on failed developer’s £300m scheme

Blackpool Central site clearance to start in the New Year as hunt starts for new developer
5 days ago

Brookfield submits retro-first London office plan

Milton Gate plan for Square Mile will hike space by nearly 50%
4 days ago

Bowmer + Kirkland gets start date for £100m Siemens site

Construction to begin early next year on Chippenham scheme
5 days ago

Torsion sells under-construction Leeds BTR scheme

Concrete frame due to start soon on 300-apartment complex
5 days ago

Contractor services