Midgard wins phase one of £500m Croydon Gateway

Aaron Morby 11 years ago
Share

Borehamwood contractor Midgard is set to start work on the fist phase of Croydon’s massive £500m Ruskin Square scheme within weeks.

The firm, which is part of the £180m turnover JRL Group, will manage the construction of the 161 flats under a £34m contract with joint venture developer Stanhope/Schroders.

These will be arranged over two high-rise blocks, 22 storeys and 9 storeys, accommodating a mixture of one and two bedroom apartments.

Screen Shot 2014-07-02 at 17.40.06

Midgard saw off bids from McLaren and United House Group to take the job, which will involve managing all activities from the pilings through the concrete frames to the fit-out and handover.

The Ruskin Square development is a former commercial high rise office site,
but has been remediated by the developer to give a flat brownfield site.

Phase 1 will see only the north eastern corner of the 9-acre Croydon Gateway site developed next to East Croydon Railway station.

Ruskin Square Croydon gateway

The completed development, designed by Foster + Partners and AHMM will include five buildings with up to 625 homes, 240,000 sq ft of offices, retail units and a car park.

It is a major coup for the JRL Group, which over two decades has grown from grown from a company specialising in sub and superstructure packages to a business incorporating six firms to offer an integrated construction service.

Latest news

Construction buyers report fastest downturn since 2020

Double whammy of decreasing new orders and delayed projects
16 hours ago

Bidders day for £15bn schools alliance framework

Online event to set out details of DfE alliancing framework procurement plan
19 hours ago

MPs told safety regulator delays forcing industry job cuts

Industry chief warns housing select committee that BSR is now a main block on meeting housing targets
19 hours ago

£600m delivery partner named for new hospital programme

Mace/T&T JV named programme delivery partner for £37bn new hospital plan
1 day ago

£230m Southampton waterfront scheme approved

Town Quay includes trio of 25 storey towers around new marina
19 hours ago

Planning green light for £10bn Northumberland data centre

Blackstone-backed project will create 1,200 construction jobs
2 days ago

Bauhaus block above Southwark Station gets green light

Student accommodation and affordable housing scheme replaces original office plan
19 hours ago

Police arrest plant hire fraud gang

Nine arrests after kit hired "with no intent of ever returning the machines"
2 days ago

Balfour Beatty boss Leo Quinn to step down

Group Chief Executive to be replaced by consultant AtkinsRéalis chief Philip Hoare
2 days ago

Galliford Try upgrades target as half-year profits jump 54%

Firm closes in on deal to take on ISG custodial work
2 days ago

Trespasser dies in crane fall at Willmott Dixon site

Tragedy after man breaks into £60m Manchester science park site
2 days ago

Ibstock pulls out of GRC cladding market

Materials giant blames subcontractor failures and low margins
2 days ago

Green light for 1,000-home Wolverhampton city centre regen

Phase one of ECF Smithgate scheme to start this year
2 days ago

Oval revises Manchester scheme with trio of towers

Flats doubled to 800 at reworked Albert Bridge House project
2 days ago

More repair work needed at McAlpine problem panel hotel

Contractor looking for long-term solution to loose panels
2 days ago

Redesign delays hit giant McAlpine car battery factory

Size of first building reduced and steelwork start pushed back
3 days ago

‘Affordable’ HS2 Crewe to Euston plan submitted to Treasury

Industry presses for scaled back Euston terminus and connection to Crewe
3 days ago

Regal submits plan to revive stalled London resi tower

Swiss Cottage project redesigned with second staircase and 237 flats
3 days ago

Construction boss jailed for siphoning off cash for casino

Money removed from contracting firms before they went under
3 days ago

Muse signs up to £3.2bn Solihull health campus district

Ambitious Arden Cross scheme next to HS2 Interchange advances
3 days ago

Drees & Sommer acquires RSP Consulting Engineers

Expanding consultant sees UK workforce grow to 300
3 days ago

Watkin Jones wins over £50m student digs campus upgrade

Work to start next month on phase 714-bed south London campus
4 days ago

Severfield warns on profits blaming major project delays

Steelwork firm cancels share buyback and steps up cost cutting programme
4 days ago

Administrators go in at aggregates firm Ashville

Administrators from Leonard Curtis now in charge of London based aggregates specialist
4 days ago

Costain start date for £67m Romford flyover replacement

Work to start this summer on Gallows Corner bridge rebuild
4 days ago

North West regional civils contractor in administration

Colin Briscoe Construction employed 25 staff
4 days ago

Work starts on tyres to jet fuel recycling plant

£100m Sunderland plant will produce around 30,000t of liquid fuel
4 days ago

Kier targets £400m of logistics work with Investec JV

Hemel Hempstead site marks start of new venture
4 days ago

Watchdog MPs raise alarm over HS2 Euston station plan

Public spending watchdog red flags 'no plan or timescale' for London Terminus
7 days ago

Network Rail fined £3.41m after Surbiton track worker death

30-year-old track worker Tyler Byrne was struck by a passenger train in Surbiton
1 week ago

Contractor services