Go-ahead for £2bn New Covent Garden Market scheme

Aaron Morby 10 years ago
Share

Joint venture development partners Vinci and St Modwen have gained planning for the £2bn regeneration of the New Covent Garden Market site in central London.

The plans with the Covent Garden Market Authority will lead to the transformation of the 57-acre site situated next to Vauxhall Cross in the Nine Elms regeneration zone.

The multi-phase scheme will take 10 years to build and includes development of 550,000 sq ft of modern facilities to house the 200 businesses that make up the UK’s largest fruit, vegetable and flower market.

Construction work will be funded from the release of 20 acres of surplus land for a residential led mixed-use regeneration scheme.

Much of this will be built on a separate site joined by a 1km linear park. In total more than 3,000 new homes and 135,000 sq ft of new office space and 100,000 sq ft of retail and leisure will be built.

Development work on the new market will commence in 2015 and on the first phase of the surplus land in 2017.

Vinci Construction UK has been earmarked to construct the new market, with other firms likely to be brought on board to build the later housing projects.

Project team

New Covent Garden Market

    • Architects: Skidmore Owings & Merrill and BDP
    • Structural Consultant: Hyland Edgar Driver
    • Quantity Surveyor: Gleeds
    • Mech & Elec Consultant: Hoare Lea
    • Market contractor: Vinci Construction UK

Northern site new covent garden market
Separate northern site in Nine Elms integrates a mix of residential towers and low rise buildings and will be linked to the market by a 1km linear park

Northern site new covent garden market
Part of the main market site will also provide housing and residential

The-Garden-at-New-Covent-Garden-Market-Night_jpg_pagespeed_ic_pco0ApKceS
Work will start on phased market rebuilding next year

The developers have agreed to pump £91m into local infrastructure improvements.

The money will be spent on a series of local transport upgrades including the now approved Northern Line Extension.

Sarah McDermott, chairman of the council’s planning committee, said: “This project covers five distinct development plots, the largest being the new wholesale market itself which will be overhauled to provide a 21st Century trading space for the food and flower businesses.

“The current flower market site would make way for a series of new buildings including three towers which will form part of the Vauxhall tall building cluster.”

Latest project news

Galliford Try to upgrade Red Arrows base

Contractor seals quartet of RAF base upgrades
12 months ago

Galliford Try bags £87m Brent Cross build to rent job

Firm picks up another three blocks at Argent's North London £8bn regeneration scheme
1 year ago

Balfour starts £67m Edinburgh school campus

Passivhaus certified campus buildings will replace Liberton High School
1 year ago

Red wins Bristol retirement village £14m expansion

44 extra care flats to be built at former Frys chocolate factory
1 year ago

Caddick bags UK’s largest fertiliser plant job

Yorkshire contractor seals £28m contract for new plant in Yorkshire
1 year ago

Mace wins concrete bunkers for world’s most powerful laser

Firm will build two 7m tall bunkers with 2m thick radiation resistant concrete walls
1 year ago

Robertson to deliver £20m Alloa Wellbeing Hub and school

Design work will now start on Wellbeing Hub and Lochies primary school
1 year ago

Green light for Canada Water next phase of 380 homes

Zone G plan includes major resi tower, supermarket and park
1 year ago

Mace to start £230m Landsec London office job

Timber Square project will pioneer a hybrid cross laminate timber and steel superstructure
1 year ago

British Land multi-storey logistics hub approved

London urban last-mile logistics hub pipeline hits £1.3bn
1 year ago

£350m Birmingham triple tower scheme approved

Vast curving Ringway Centre to be demolished for 1,750 flats development
1 year ago

Midgard lands £245m Tottenham Hale towers

Three towers of up to 38 storeys complete north London regeneration scheme
1 year ago

Go-ahead for Wates £35m Hartlepool leisure centre job

Work on the Highlight waterfront centre to start in November
1 year ago

Green light for 690-home Birmingham Smithfield scheme

Prosperity Group plans to start work in Autumn next year on major Smithfield scheme
1 year ago

Go-ahead for 289 homes next to Saltaire World Heritage site

Ambitious plan to demolish a vacant Bradford office complex for new residential quarter
1 year ago

Plans in for 800-bed Leeds student and retail scheme

Major scheme will replace The Core shopping centre in the city
1 year ago

McAleer & Rushe awarded £60m Barking flats job

Work to start in November on near 200 rental homes project
1 year ago

ISG clinches £155m Cat D prison expansion

Firm to deliver 780 new places at three existing prison locations
1 year ago

27-storey Salford student tower approved

540-bed student block to be built on former site of McDonalds' regional HQ
1 year ago

Morgan Sindall £48m Dumfries school job approved

Building work to start before the end of 2023
1 year ago

Bouygues/Murphy JV tipped for £2.3bn Thames tunnel job

Frontrunner emerges for Lower Thames Crossing 4.2km tunnel job
1 year ago

Vinci/McAlpine JV to start £105m NHS rehabilitation centre

Treasury clears New Hospital Programme job to start main construction
1 year ago

Three giant lab buildings approved at £700m Oxford R&D district

Phase 2 Oxford North office and lab buildings to deliver 460,000 sq ft of space
1 year ago

RG Group to build tallest student block in the world

Contractor confirmed on 45-storey tower in Leeds
1 year ago

Vinci wins major St Helens town centre revamp

£90m first phase includes new market hall, 120-bed hotel and over 60 flats
1 year ago

Work to start this year on Manchester £250m spa resort

Developer Therme gets green light for re-engineered 28-acre Trafford complex
1 year ago

Barhale JV sign-off for £18m Dewsbury sewage works upgrade

Project forms part of Yorkshire Water’s £500m investment in Phosphorous removal
1 year ago

Murphy seals main build on £124m Essex station

Contractor lands main contract after successful start on enabling works package
1 year ago

GMI lands latest £42m phase of lab cluster

Citylabs life sciences complex in Manchester continues to grow
1 year ago

Green light for Canada Water commercial scheme

Twin-tower scheme will offer "a new type of office for London"
1 year ago

Contractor services