{"id":411770,"date":"2019-11-25T14:32:35","date_gmt":"2019-11-25T14:32:35","guid":{"rendered":"http:\/\/www.constructionenquirer.com\/?p=411770"},"modified":"2019-11-26T12:26:44","modified_gmt":"2019-11-26T12:26:44","slug":"ground-survey-deal-up-for-grabs-at-500m-energy-plant","status":"publish","type":"post","link":"https:\/\/www.constructionenquirer.com\/2019\/11\/25\/ground-survey-deal-up-for-grabs-at-500m-energy-plant\/","title":{"rendered":"Ground survey deal up for grabs at \u00a3600m energy plant"},"content":{"rendered":"<p>The latest package tender is up for grabs on the \u00a3600m North London Heat and Power Project.<\/p>\n<p>Client North London Waste Authority (NLWA) is looking for specialists who can conduct intrusive ground\u00a0surveys by vacuum excavation.<\/p>\n<p>The \u00a3850,000 for extensive investigative and\u00a0enabling works will prepare the brownfield site at Edmonton EcoPark for development.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\"><div class=\"sleeve\"><a data-ad-id=\"479429\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.vpgroundforce.com%2Fgb%2Fyoursolution%2F%3Futm_source%3Dconstructionenquirersite%26utm_medium%3Dwebskins%26utm_campaign%3Dys%252Blaunch%26utm_id%3Dyoursolution%252Blaunch%26utm_content%3DMPU%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/jan vp CE MPU 300 x 250.gif\"\/><\/a><\/div><\/div>\n<p>NLWA said a series of intrusive ground investigation works are required following a review of the existing underground utilities.<\/p>\n<p>It added: &#8220;These works play a crucial part in delivering the project and the results will help to improve the quality of the design, the ability to construct and the safety of operations on site.&#8221;<\/p>\n<p>The winning contractor procured will:<\/p>\n<div class=\"ad-mpu ad-mpu-inline\"><div class=\"sleeve\"><a data-ad-id=\"488802\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fjmclarkltd.co.uk%2F%3Futm_source%3DConstruction%2520Enquirer%26utm_medium%3DPaid%2520other%26utm_campaign%3DOctober%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/GIF construction[6][3].gif\"\/><\/a><\/div><\/div>\n<ul>\n<li>Provide clarification of any ambiguous information on existing records<\/li>\n<li>Identify the type, condition, size, depth and orientation of each utility<\/li>\n<li>Confirm whether the utility is operational or redundant<\/li>\n<\/ul>\n<p>The overall projecty will see the replacement of the existing energy from waste facility with a new world-class Energy Recovery Facility.<\/p>\n<p>The new facility will convert up to 700,000 tonnes of north London\u2019s non-recyclable waste to energy, diverting it from going to landfill and generating up to 78 megawatts of electricity.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\"><div class=\"sleeve\"><a data-ad-id=\"431748\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fvacukltd.co.uk%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/VACUK_V4.gif\"\/><\/a><\/div><\/div>\n<p>The project also includes a Reuse and Recycling Centre enabling north London residents to bring their recyclable materials directly to the Edmonton EcoPark.<\/p>\n<p>More details on the ground survey package can be found <a href=\"https:\/\/www.contractsfinder.service.gov.uk\/Notice\/d3285100-b5d4-4564-ae63-5433dd28533c?p=@xUlRRPT0=NjJNT08=UFQ\" target=\"_blank\" rel=\"noopener\">here<\/a>.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\"><div class=\"sleeve\"><a data-ad-id=\"493329\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.vpgroundforce.com%2Fgb%2Fpipe-stoppers%2Fproducts%2Fpressure-testing%2Fsmart-pressure-testing-app%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/SS PressureTest+ 300_250px.gif\"\/><\/a><\/div><\/div>\n<div class=\"ad-mpu ad-mpu-inline\"><div class=\"sleeve\"><a data-ad-id=\"172063\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.vp-tpa.com%2Fgb%2Fforms%2Fdry-hire-enquiry%2F%3Futm_source%3Dconstruction_enquirer%26utm_medium%3Dq2_mpu%26utm_campaign%3Ddryhire2024%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Q@2 VPA 300_250px Animated MPU.gif\"\/><\/a><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Intrusive ground surveys needed to pave way for construction of north London scheme<\/p>\n","protected":false},"author":3,"featured_media":142869,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3,16571],"tags":[31,15691,19449,17183],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2024-12-21 05:48:23","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category"},"_links":{"self":[{"href":"https:\/\/www.constructionenquirer.com\/wp-json\/wp\/v2\/posts\/411770"}],"collection":[{"href":"https:\/\/www.constructionenquirer.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionenquirer.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionenquirer.com\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionenquirer.com\/wp-json\/wp\/v2\/comments?post=411770"}],"version-history":[{"count":5,"href":"https:\/\/www.constructionenquirer.com\/wp-json\/wp\/v2\/posts\/411770\/revisions"}],"predecessor-version":[{"id":412090,"href":"https:\/\/www.constructionenquirer.com\/wp-json\/wp\/v2\/posts\/411770\/revisions\/412090"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionenquirer.com\/wp-json\/wp\/v2\/media\/142869"}],"wp:attachment":[{"href":"https:\/\/www.constructionenquirer.com\/wp-json\/wp\/v2\/media?parent=411770"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionenquirer.com\/wp-json\/wp\/v2\/categories?post=411770"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionenquirer.com\/wp-json\/wp\/v2\/tags?post=411770"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}